Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2018-05-14 09:14:31
Size: 100
Comment:
Revision 7 as of 2018-05-14 10:23:00
Size: 939
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
== Membership == == Participants ==
苔山、中野、麻生、長野、上原
Line 5: Line 6:
== 2018年度メンバーの確認 ==
→次回
Line 7: Line 10:
 * ISSはレーザーサブグループに移行しました (担当・森脇、三尾)
 * ALSは独立のグループになりました(担当・道村、和泉)
Line 9: Line 14:
 * Chart https://docs.google.com/spreadsheets/d/19xC6L0TJmjMtuSEoGe7Z7SVVK78MD4S52m0Hm0C5IKw/edit
 * Punchlist https://docs.google.com/spreadsheets/d/1hHhXEqC5DwITUqYFjVgB-ZnAb53V1C4OlaeYNqjblCI/edit#gid=0

== Report from Last 2 weeks ==
 * Phase-1 has finished
 * MC chambers were vent klog4965
 * Duct replacement klog4980

== Plans for the coming 2 weeks ==
 * MCOの修理(大石、桐井)
 * PSLフロントの清掃、クリーンブース・フィルター設置(苔山、中野、三代木、早河、ミラプロ)
 * refcav pump?
 * MZI?

Regular Meeting 0514

Participants

苔山、中野、麻生、長野、上原

2018年度メンバーの確認

→次回

Announcement

  • ISSはレーザーサブグループに移行しました (担当・森脇、三尾)
  • ALSは独立のグループになりました(担当・道村、和泉)

Schedule for Phase-2

Report from Last 2 weeks

  • Phase-1 has finished
  • MC chambers were vent klog4965
  • Duct replacement klog4980

Plans for the coming 2 weeks

  • MCOの修理(大石、桐井)
  • PSLフロントの清掃、クリーンブース・フィルター設置(苔山、中野、三代木、早河、ミラプロ)
  • refcav pump?
  • MZI?

KAGRA/Subgroups/IOO/Meeting/Meeting20180514 (last edited 2018-05-14 10:23:00 by KeikoKokeyama)