Size: 980
Comment:
|
← Revision 6 as of 2018-07-23 10:21:53 ⇥
Size: 1746
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
苔山、冨士川、 佐藤、大河、鈴木、菅井、藤井、村上、中野, Ge, Izumi | |
Line 7: | Line 8: |
* Registration for the JPS meeting is today |
* Registration for the JPS meeting is today (大河、鈴木、菅井、富士川、藤井, Ge will join) |
Line 15: | Line 15: |
* PSL * MZM * PEM |
* IMC - locked. * Updated PSL layout ([[https://granite.phys.s.u-tokyo.ac.jp/svn/KAGRA/trunk/ioo/|svn]]) * MZM - [Uehara, YamamotoKoh, Ge] all the mirrors for MZM were installed. MZI1 contrast is good. MZI2 delay line mode matching was not very good. MM for IMC is not very good (coupling with 20 is strong). * PEM - [Fujikawa, Mori, Kaihotsu, Yokozawa] |
Line 21: | Line 21: |
* PSL * MZM * PEM * Laser delivery * MC_REFL shield |
* PSL - Mode matching for IMC * MZM - More MM, MZI controls * PEM - ACC and magnetometer * Laser delivery - installation will start * MC_REFL shield - Tanaka & Tanaka * ISS - ISS_AOM installation by Yoshioka-kun |
Line 33: | Line 34: |
* (ISS) Yoshioka-kun | |
Line 34: | Line 36: |
* Anna from Sep 5th | |
Line 38: | Line 40: |
* 7/26 Nakano not available for a high school tour | |
Line 42: | Line 44: |
* August 6th |
Regular Meeting 0723
Participants
苔山、冨士川、 佐藤、大河、鈴木、菅井、藤井、村上、中野, Ge, Izumi
Announcement
Registration for the F2F meeting in August at Toyama U is open (link, 3 IOO slots)
- Registration for the JPS meeting is today (大河、鈴木、菅井、富士川、藤井, Ge will join)
Schedule for Phase-2
Chart https://docs.google.com/spreadsheets/d/19xC6L0TJmjMtuSEoGe7Z7SVVK78MD4S52m0Hm0C5IKw/edit
Punchlist https://docs.google.com/spreadsheets/d/1hHhXEqC5DwITUqYFjVgB-ZnAb53V1C4OlaeYNqjblCI/edit#gid=0
Report from the Last 2 weeks
- IMC - locked.
Updated PSL layout (svn)
MZM - [Uehara, YamamotoKoh, Ge] all the mirrors for MZM were installed. MZI1 contrast is good. MZI2 delay line mode matching was not very good. MM for IMC is not very good (coupling with 20 is strong).
- PEM - [Fujikawa, Mori, Kaihotsu, Yokozawa]
Plans for the coming 2 weeks
- PSL - Mode matching for IMC
- MZM - More MM, MZI controls
- PEM - ACC and magnetometer
- Laser delivery - installation will start
MC_REFL shield - Tanaka & Tanaka
- ISS - ISS_AOM installation by Yoshioka-kun
Visitors
- GE, guiguo from WIPM
- Uehara-san
- (PEM) Fujikawa-kun, Mori-san, Kaihotsu-kun
- (Laser) Tahara-kun
- (MC Shield) Tanaka-kun, Tanaka-kun
- (ISS) Yoshioka-kun
- Anna from Sep 5th
Absence
- 7/25~26 Kokeyama not available for PAB
- 7/26 Nakano not available for a high school tour
Next meeting
- August 6th