Differences between revisions 2 and 4 (spanning 2 versions)
Revision 2 as of 2018-10-02 10:53:55
Size: 1964
Comment:
Revision 4 as of 2018-10-02 10:55:44
Size: 2009
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
 * IMC - ASC: MEDM and models were modified for DC centering control. Two ways to control so far we tried; dof1~3 - WFS individual mirror, or dof4 - I&O. Waiting for the PZT mounts for the DC control. PSL PZT position is not good. PZT voltage to change to the mid range of the actuator.  * IMC - ASC: MEDM and models were modified for the DC centering control. Currently there are two ways to control; dof1~3 - WFS individual mirror, or dof4 - I&O. Waiting for the PZT mounts for the DC control. PSL PZT position is with random offsets voltage. PZT voltage to change to the mid range of the actuator.
Line 16: Line 16:
 * PLS - PMC:temperature loop was added, working well. Thin film polarizer will be installed on next Monday. Power will go up to 5W this week.  * PLS - PMC:temperature loop was added, working well. The thin film polarizer pair will be installed on next Monday. Power will go up to 5W this week.
Line 19: Line 19:
 * PEM - Fujikawa-ku will hunt the MZM noise.  * PEM - Fujikawa-kun will hunt the MZM noise.
Line 31: Line 31:
Nakano-kun 19th Fri, 22nd MonKokeyama will work on Detchar in the week of 15th from Mozumi (no mine entrance)  * Nakano-kun 19th Fri, 22nd Mon
 *
Kokeyama will work on Detchar in the week of 15th from Mozumi (no mine entrance)

Regular Meeting 1002

Participants

Kokeyama, Nakano, Ge, Tanioka, Yamakoh, Fujikawa, Green

Announcement

  • Mine entrance system will change from 6th Oct (see Prof Miyoki's email on KAGRA-all ML, 10/1 17:14)

Schedule for Phase-2

Report from the Last 2 weeks

  • IMC - ASC: MEDM and models were modified for the DC centering control. Currently there are two ways to control; dof1~3 - WFS individual mirror, or dof4 - I&O. Waiting for the PZT mounts for the DC control. PSL PZT position is with random offsets voltage. PZT voltage to change to the mid range of the actuator.

  • MZM - 1st PZT was broken, and new one was installed. Alignement is still bad. Another new bigger PZT for the 1st MZI. 1st MZI, check the

IMC alignment carefully. Control scheme for both MZIs should work well now if we have enough range with the new PZT. Power fluctuation still there, but not seen on the measurement day (klog). Maybe related to the PMC temperature loop??

  • PLS - PMC:temperature loop was added, working well. The thin film polarizer pair will be installed on next Monday. Power will go up to 5W this week.

  • RAM - no progress
  • HPL - Heat sinks with coating arrived. Some parts were lost when delivery...LightTools are ready.

  • PEM - Fujikawa-kun will hunt the MZM noise.
  • IMMT1/IMMT2 - to measure TFs in vac.
  • MC mirrors will clean with the first contacts before December HP.

Visitors

Absence

  • Nakano-kun 19th Fri, 22nd Mon
  • Kokeyama will work on Detchar in the week of 15th from Mozumi (no mine entrance)

Next meeting

Oct 15th

KAGRA/Subgroups/IOO/Meeting/Meeting20181002 (last edited 2018-10-02 10:56:25 by KeikoKokeyama)