Differences between revisions 1 and 2
Revision 1 as of 2018-11-20 07:18:29
Size: 175
Comment:
Revision 2 as of 2018-11-26 10:55:18
Size: 760
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
Kokeyama, Sato, Ohkawa, Uehara, Michimura
Line 9: Line 10:
 * corner vent from Dec 10 -
Line 11: Line 13:
 * beam dumps and shields are being prepared (the shields are delivered and about to send for solblack. V shape dump under design phase)
 * report from LLO https://www.dropbox.com/sh/mjpga3kff5emxpa/AABQikYkNkaAd4t8wpREbbC7a?dl=0
 
== memo ==
 * LIGO PSL's emergency button seems a very good idea. Button are at several places, and all the laser sources are stopped by any button.
 * We want to swap the rigid posts for the main paths at least MZM path.
Line 13: Line 21:
 * Uehara-san from Dec 11-
 * Guiguo from Dec 3-

IOO meeting on 2018/11/26

Connection

https://zoom.us/j/5045179604

Participants

Kokeyama, Sato, Ohkawa, Uehara, Michimura

Announcements

  • corner vent from Dec 10 -

Reports from projects

memo

  • LIGO PSL's emergency button seems a very good idea. Button are at several places, and all the laser sources are stopped by any button.
  • We want to swap the rigid posts for the main paths at least MZM path.

Visitors

  • Uehara-san from Dec 11-
  • Guiguo from Dec 3-

KAGRA/Subgroups/IOO/Meeting/Meeting20181126 (last edited 2018-11-26 10:55:18 by KeikoKokeyama)