IOO meeting on 2018/11/26
Connection
Participants
Kokeyama, Sato, Ohkawa, Uehara, Michimura
Announcements
- corner vent from Dec 10 -
Reports from projects
- beam dumps and shields are being prepared (the shields are delivered and about to send for solblack. V shape dump under design phase)
report from LLO https://www.dropbox.com/sh/mjpga3kff5emxpa/AABQikYkNkaAd4t8wpREbbC7a?dl=0
memo
- LIGO PSL's emergency button seems a very good idea. Button are at several places, and all the laser sources are stopped by any button.
- We want to swap the rigid posts for the main paths at least MZM path.
Visitors
- Uehara-san from Dec 11-
- Guiguo from Dec 3-