Differences between revisions 1 and 14 (spanning 13 versions)
Revision 1 as of 2019-01-14 12:19:55
Size: 287
Comment:
Revision 14 as of 2019-01-15 13:33:56
Size: 1051
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
== Connection ==

Zoom3: https://zoom.us/j/5045179604
Line 4: Line 8:
Sato, Fujikawa, Nakano, Ge, Kokeyama
Line 5: Line 10:
== Announcement ==
 * 共同利用申請書
 * MZM will not be used in O3, technical review on Jan 22
== Announcements ==
 * 共同利用申請書 (IOO topics: Niigata U, Titech, Toyama U)
 * MZM will not be used in O3, technical review on Jan 22 (Tue) in the commissioning meeting slot
Line 9: Line 14:
 * JPS abstract submission 21st Jan
 * Nakano-san obtained PhD!
 * Yamakoh master thesis defense today
Line 12: Line 20:
 * Ready for the high power
 * MZM will be broken
Line 13: Line 24:
 * Mirror cleaning with first contacts are done, thanks to Hirose-san
 * In-air alignment was done, ready for the evacuation
 * Finesse measurement
 * Angular control
Line 14: Line 30:
 * Rigid pedestal will be tested
Line 15: Line 33:
 * IMMT shields were installed
 * Waiting for the V-shape beam dump parts
Line 16: Line 37:


== Visitor ==
 * Guiguo will be away Jan 22 - Feb 10
 * June Gyu Park will be able to visit KAGRA this year for total 2 weeks

IOO meeting 2019 0115

Connection

Zoom3: https://zoom.us/j/5045179604

Participants

Sato, Fujikawa, Nakano, Ge, Kokeyama

Announcements

  • 共同利用申請書 (IOO topics: Niigata U, Titech, Toyama U)
  • MZM will not be used in O3, technical review on Jan 22 (Tue) in the commissioning meeting slot
  • registration for KIW
  • JPS abstract submission 21st Jan
  • Nakano-san obtained PhD!
  • Yamakoh master thesis defense today

Recent Status

PSL

  • Ready for the high power
  • MZM will be broken

IMC

  • Mirror cleaning with first contacts are done, thanks to Hirose-san
  • In-air alignment was done, ready for the evacuation
  • Finesse measurement
  • Angular control

MZM

  • Rigid pedestal will be tested

Beam Dump

  • IMMT shields were installed
  • Waiting for the V-shape beam dump parts

OMC, OMMT, OSTM

Visitor

  • Guiguo will be away Jan 22 - Feb 10
  • June Gyu Park will be able to visit KAGRA this year for total 2 weeks

KAGRA/Subgroups/IOO/Meeting/Meeting20190115 (last edited 2019-01-15 13:33:56 by KeikoKokeyama)