844
Comment:
|
937
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
* ready for the high power | * Ready for the high power * MZM will be broken |
Line 22: | Line 23: |
* Mirror cleaning with first contacts are done, thaks to Hirose-san | * Mirror cleaning with first contacts are done, thanks to Hirose-san |
Line 24: | Line 25: |
* Finesse measurement * Angular control |
|
Line 26: | Line 29: |
* Rigid pedestal will be tested | * Rigid pedestal will be tested |
Line 30: | Line 33: |
* waiting for the V-shape beam dump parts | * Waiting for the V-shape beam dump parts |
Line 34: | Line 37: |
Line 35: | Line 39: |
* Guiguo ~Feb ? | * Guiguo will be away Jan 22 Feb 10 |
IOO meeting 2019 0115
Connection
Zoom3: https://zoom.us/j/5045179604
Participants
Announcements
- 共同利用申請書 (IOO topics: Niigata U, Titech, Toyama U)
- MZM will not be used in O3, technical review on Jan 22 (Tue) in the commissioning meeting slot
- registration for KIW
- JPS abstract submission 21st Jan
- Nakano-san obtained PhD!
- Yamakoh master thesis defense today
Recent Status
PSL
- Ready for the high power
- MZM will be broken
IMC
- Mirror cleaning with first contacts are done, thanks to Hirose-san
- In-air alignment was done, ready for the evacuation
- Finesse measurement
- Angular control
MZM
- Rigid pedestal will be tested
Beam Dump
- IMMT shields were installed
- Waiting for the V-shape beam dump parts
OMC, OMMT, OSTM
Visitor
- Guiguo will be away Jan 22 Feb 10