Line 19: Line 19:
 * ready for the high power  * Ready for the high power
 * MZM will be broken
Line 22: Line 23:
 * Mirror cleaning with first contacts are done, thaks to Hirose-san  * Mirror cleaning with first contacts are done, thanks to Hirose-san
Line 24: Line 25:
 * Finesse measurement
 * Angular control
Line 26: Line 29:
 * Rigid pedestal will be tested  * Rigid pedestal will be tested 
Line 30: Line 33:
 * waiting for the V-shape beam dump parts  * Waiting for the V-shape beam dump parts
Line 34: Line 37:
Line 35: Line 39:
 * Guiguo ~Feb ?  * Guiguo will be away Jan 22 Feb 10

IOO meeting 2019 0115

Connection

Zoom3: https://zoom.us/j/5045179604

Participants

Announcements

  • 共同利用申請書 (IOO topics: Niigata U, Titech, Toyama U)
  • MZM will not be used in O3, technical review on Jan 22 (Tue) in the commissioning meeting slot
  • registration for KIW
  • JPS abstract submission 21st Jan
  • Nakano-san obtained PhD!
  • Yamakoh master thesis defense today

Recent Status

PSL

  • Ready for the high power
  • MZM will be broken

IMC

  • Mirror cleaning with first contacts are done, thanks to Hirose-san
  • In-air alignment was done, ready for the evacuation
  • Finesse measurement
  • Angular control

MZM

  • Rigid pedestal will be tested

Beam Dump

  • IMMT shields were installed
  • Waiting for the V-shape beam dump parts

OMC, OMMT, OSTM

Visitor

  • Guiguo will be away Jan 22 Feb 10

KAGRA/Subgroups/IOO/Meeting/Meeting20190115 (last edited 2019-01-15 13:33:56 by KeikoKokeyama)