Differences between revisions 1 and 2
Revision 1 as of 2019-04-01 09:27:59
Size: 518
Comment:
Revision 2 as of 2019-04-01 10:13:13
Size: 634
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
   * Nakano-kun will give the input status
   * Output status talk
Line 26: Line 28:
 * Fujikawa-kun will join Kamioka from August

IOO meeting 2019 0115

Connection

zoom 1: https://zoom.us/j/7631499341

Participants

Announcements

  • 2019 Member check
  • F2F (Kashiwa, 4/19-21) registration deadline 4/10
    • Nakano-kun will give the input status
    • Output status talk
  • KIW 7 Wuhan 6/21-23

Recent Status

PSL

  • High power test done
  • High power beam dump to-do's
  • MZM mod index measurement still going
  • PMC noise measurement by Nakano-kun

OMC, OMMT, OSTM

Visitor

  • June Gyu Park's visit from next weel (4/8) for the IMC ASC
  • Fujikawa-kun will join Kamioka from August

KAGRA/Subgroups/IOO/Meeting/Meeting20190401 (last edited 2019-04-01 10:52:05 by KeikoKokeyama)