Differences between revisions 15 and 16
Revision 15 as of 2019-05-13 12:00:49
Size: 1886
Comment:
Revision 16 as of 2019-05-13 12:01:21
Size: 1941
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * Nakano-kun becomes the IOO chief  * Nakano-kun becomes the IOO chief (official approval is planned in the last week of May)

IOO meeting 2019 0513

Connection

Zoom3: https://zoom.us/j/5045179604

Participants

Kokeyama, Nakano, Ge, Nagano, Yamakoh, Ohkawa, Aso, Tanioka

Announcements

Conferences

Recent Status

PSL

IMC

  • IMC ASC mostly commissioned. Waiting for the good timing for the IP mirror position change.

OMC, OMMT, OSTM

  • Leak test was done and had no problem for the OMC area
  • the copper PD sockets were delivered, planned to be replaced after O3
  • QPD drivers were delivered, but haven't tested yet
  • PZT drier was ordered to AEL
  • Alignment the OSTM trans beam to OMC was done
  • QPD signal, OMC resonance was seen

Visitor

  • Fujikawa-kun (Niigata, Ohkawa-lab) joins Kamioka from August for IOO/Detchar. Regular telecon with Yokozawa-kun started.
  • Koyama-kun and Prof Suzuki (Niigata) will visit Kamioka
  • GG leaving on early June

KAGRA/Subgroups/IOO/Meeting/Meeting20190513 (last edited 2019-05-14 09:32:02 by KeikoKokeyama)