=== Task List for OMC and OFI (updated 18/3/11) ===
||item||state||
||Design a post||Not yet||
||Make a breadboard for OFI||Not yet||
||Check the extinction ratio of OFI||Not yet||
||Design and make the Transport fixture for OMC||On going||
||Make a mount for PD(for OMC)||Not yet||
||Make a QPD for monitoring alignment of OMC||Not yet||
||Make a control system for alignment of OMC||Not yet||
||Design a frame of suspension for OMC||On going||
||Control test and cabling (in Air and vacuum)||Not yet||
||Make a suspension for OFI||Not yet||
||Install OMC and its suspension||Not yet||
||Install OFI and its suspension||Not yet||
||Simulation of control MIF using beacon signal||Not yet||
||Check the all calculation by Somiya-san about OMC||Not yet||
||Make a control system for OMC in Digital system||Not yet||
=== Task List for Phase-1 OMC and OFI (updated 18/3/13) ===
||<:>tasks||<:>person in charge||due date||<:>status||
||OMMT1/2 mirrors||<:>Hirose||<:>end March||to be delivered in March||
||OMMT1/2 suspensions||<:>Ohishi||<:>3Q 2018||planned to be manufactured in fall 2018||
||OSTM bluk||<:>Hirose/Somiya||<:>April||to be delivered to ICRR on April 5||
||OSTM polish/coating||<:>Hirose||<:>3Q 2018||to be ordered in April||
||OSTM suspensions||<:>Ohishi||<:>4Q 2018||planned to be manufactured in fall 2018||
||Pillars for output optics||<:>Somiya||<:>2Q 2018||Al blocks delivered and sent to TT machine shop||
||In-vac RF PD/QPDs||<:>Michimura||<:>3Q 2018||Not yet||
||OFI breadboard||<:>Somiya||<:>1Q 2018||designing||
||OFI TFP mounts||<:>Somiya||<:>1Q 2018||new mounts being designed||
||OFI input/output baffle||<:>Somiya||<:>1Q 2018||being designed||
||OFI beam dump||<:>Somiya||<:>1Q 2018||being considered||
||OFI optical properties||<:>Otabe/Ribes||<:>1Q 2018||TFP extinction ratio measured||
||OFI spacer||<:>Somiya||<:>1Q 2018||Not yet||
||OFI installation||<:>||<:>3Q 2018||Planned in Sep 2018 or earlier||
||OMC transport fixture||<:>Somiya||<:>3Q 2018||Not yet||
||OMC PD Mounts||<:>Somiya||<:>2Q 2018||Excelitas PD pin location should be checked||
||OMC QPD Mounts||<:>Somiya||<:>2Q 2018||QPD pin location should be checked||
||OMC beam dump||<:>Somiya||<:>1Q 2018||Delivered to TT||
||OMC LSC||<:>||<:>2020||Partially done||
||OMC ASC||<:>||<:>2020||Not yet||
||OMC suspension frame||<:>Somiya||<:>3Q 2018||Tested some examples but not easy||
||OMC Cablings||<:>Somiya+someone||<:>3Q 2018||Dsub connectors and AWG32 cables ordered; to be test-manufactured at TT||
||OMC installation||<:>||<:>4Q 2018||Planned in Sep-Oct 2018||
||RF readout path setup||<:>||<:>4Q 2018||||
||Beacon signal simulation||<:>||<:>||Not yet||
||Cross-check of the OMC/OFI calculations||<:>||<:>||Not yet||
||Digital system for OMC||<:>||<:>||Not yet||

=== Task List for Phase-2 OMC and OFI (updated 18/3/13) ===
||OFI suspension||<:>||<:>||Not yet||
||OFI suspension frame||<:>||<:>||Not yet||
||OMC silica breadboard||<:>Somiya||<:>3Q 2018||to be ordered in March||
||OMC actuator||<:>||<:>||Not yet||

Task List for Phase-1 OMC and OFI (updated 18/3/13)

tasks

person in charge

due date

status

OMMT1/2 mirrors

Hirose

end March

to be delivered in March

OMMT1/2 suspensions

Ohishi

3Q 2018

planned to be manufactured in fall 2018

OSTM bluk

Hirose/Somiya

April

to be delivered to ICRR on April 5

OSTM polish/coating

Hirose

3Q 2018

to be ordered in April

OSTM suspensions

Ohishi

4Q 2018

planned to be manufactured in fall 2018

Pillars for output optics

Somiya

2Q 2018

Al blocks delivered and sent to TT machine shop

In-vac RF PD/QPDs

Michimura

3Q 2018

Not yet

OFI breadboard

Somiya

1Q 2018

designing

OFI TFP mounts

Somiya

1Q 2018

new mounts being designed

OFI input/output baffle

Somiya

1Q 2018

being designed

OFI beam dump

Somiya

1Q 2018

being considered

OFI optical properties

Otabe/Ribes

1Q 2018

TFP extinction ratio measured

OFI spacer

Somiya

1Q 2018

Not yet

OFI installation

3Q 2018

Planned in Sep 2018 or earlier

OMC transport fixture

Somiya

3Q 2018

Not yet

OMC PD Mounts

Somiya

2Q 2018

Excelitas PD pin location should be checked

OMC QPD Mounts

Somiya

2Q 2018

QPD pin location should be checked

OMC beam dump

Somiya

1Q 2018

Delivered to TT

OMC LSC

2020

Partially done

OMC ASC

2020

Not yet

OMC suspension frame

Somiya

3Q 2018

Tested some examples but not easy

OMC Cablings

Somiya+someone

3Q 2018

Dsub connectors and AWG32 cables ordered; to be test-manufactured at TT

OMC installation

4Q 2018

Planned in Sep-Oct 2018

RF readout path setup

4Q 2018

Beacon signal simulation

Not yet

Cross-check of the OMC/OFI calculations

Not yet

Digital system for OMC

Not yet

Task List for Phase-2 OMC and OFI (updated 18/3/13)

OFI suspension

Not yet

OFI suspension frame

Not yet

OMC silica breadboard

Somiya

3Q 2018

to be ordered in March

OMC actuator

Not yet