Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2018-03-12 14:52:36
Size: 831
Comment:
Revision 7 as of 2018-03-12 15:21:13
Size: 1045
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
||item||state||
||Design a post||Not yet||
||Make a breadboard for OFI||Not yet||
||Check the extinction ratio of OFI||Not yet||
||Design and make the Transport fixture for OMC||On going||
||Make a mount for PD(for OMC)||Not yet||
||Make a QPD for monitoring alignment of OMC||Not yet||
||Make a control system for alignment of OMC||Not yet||
||Design a frame of suspension for OMC||On going||
||Control test and cabling (in Air and vacuum)||Not yet||
||Make a suspension for OFI||Not yet||
||Install OMC and its suspension||Not yet||
||Install OFI and its suspension||Not yet||
||Simulation of control MIF using beacon signal||Not yet||
||Check the all calculation by Somiya-san about OMC||Not yet||
||Make a control system for OMC in Digital system||Not yet||
||<:>tasks||<:>person in charge||due date||<:>status||
||Pillars for output optics||<:>Somiya||<:>||Al blocks delivered and sent to TT machine shop||
||OFI breadboard||<:>Somiya||<:>||designing||
||OFI optical properties||<:>Otabe/Ribes||<:>||TFP extinction ratio measured||
||Transport fixture for OMC||<:>||<:>||Not yet||
||PD Mounts||<:>||<:>||Excelitas PD pin location should be checked||
||QPD Mounts||<:>||<:>||QPD pin location should be checked||
||Control system for OMC ASC||<:>||<:>||Not yet||
||OMC suspension frame||<:>||<:>||Tested some examples but not easy||
||Cablings||<:>||<:>||Dsub connectors and AWG32 cables ordered; to be test-manufactured at TT||
||OFI spacer||<:>||<:>||Not yet||
||OMC installation||<:>||<:>||Planned in Sep-Oct 2018||
||OFI installation||<:>||<:>||Planned in Sep 2018 or earlier||
||Beacon signal simulation||<:>||<:>||Not yet||
||Cross-check of the OMC calculations||<:>||<:>||Not yet||
||Digital system for OMC||<:>||<:>||Not yet||

Task List for OMC and OFI (updated 18/3/11)

tasks

person in charge

due date

status

Pillars for output optics

Somiya

Al blocks delivered and sent to TT machine shop

OFI breadboard

Somiya

designing

OFI optical properties

Otabe/Ribes

TFP extinction ratio measured

Transport fixture for OMC

Not yet

PD Mounts

Excelitas PD pin location should be checked

QPD Mounts

QPD pin location should be checked

Control system for OMC ASC

Not yet

OMC suspension frame

Tested some examples but not easy

Cablings

Dsub connectors and AWG32 cables ordered; to be test-manufactured at TT

OFI spacer

Not yet

OMC installation

Planned in Sep-Oct 2018

OFI installation

Planned in Sep 2018 or earlier

Beacon signal simulation

Not yet

Cross-check of the OMC calculations

Not yet

Digital system for OMC

Not yet

KAGRA/Subgroups/IOO/OMC/Tasks (last edited 2018-04-03 15:16:51 by ShinKirii)