Size: 831
Comment:
|
Size: 1089
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
=== Task List for OMC and OFI (updated 18/3/11) === ||item||state|| ||Design a post||Not yet|| ||Make a breadboard for OFI||Not yet|| ||Check the extinction ratio of OFI||Not yet|| ||Design and make the Transport fixture for OMC||On going|| ||Make a mount for PD(for OMC)||Not yet|| ||Make a QPD for monitoring alignment of OMC||Not yet|| ||Make a control system for alignment of OMC||Not yet|| ||Design a frame of suspension for OMC||On going|| ||Control test and cabling (in Air and vacuum)||Not yet|| ||Make a suspension for OFI||Not yet|| ||Install OMC and its suspension||Not yet|| ||Install OFI and its suspension||Not yet|| ||Simulation of control MIF using beacon signal||Not yet|| ||Check the all calculation by Somiya-san about OMC||Not yet|| ||Make a control system for OMC in Digital system||Not yet|| |
=== Task List for OMC and OFI (updated 18/3/12) === ||<:>tasks||<:>person in charge||due date||<:>status|| ||Pillars for output optics||<:>Somiya||<:>||Al blocks delivered and sent to TT machine shop|| ||OFI breadboard||<:>Somiya||<:>||designing|| ||OFI optical properties||<:>Otabe/Ribes||<:>||TFP extinction ratio measured|| ||Transport fixture for OMC||<:>Somiya||<:>||Not yet|| ||PD Mounts||<:>Somiya||<:>||Excelitas PD pin location should be checked|| ||QPD Mounts||<:>Somiya||<:>||QPD pin location should be checked|| ||Control system for OMC ASC||<:>||<:>||Not yet|| ||OMC suspension frame||<:>Somiya||<:>||Tested some examples but not easy|| ||Cablings||<:>Somiya+someone||<:>||Dsub connectors and AWG32 cables ordered; to be test-manufactured at TT|| ||OFI spacer||<:>Somiya||<:>||Not yet|| ||OMC installation||<:>||<:>||Planned in Sep-Oct 2018|| ||OFI installation||<:>||<:>||Planned in Sep 2018 or earlier|| ||Beacon signal simulation||<:>||<:>||Not yet|| ||Cross-check of the OMC calculations||<:>||<:>||Not yet|| ||Digital system for OMC||<:>||<:>||Not yet|| |
Task List for OMC and OFI (updated 18/3/12)
tasks |
person in charge |
due date |
status |
Pillars for output optics |
Somiya |
Al blocks delivered and sent to TT machine shop |
|
OFI breadboard |
Somiya |
designing |
|
OFI optical properties |
Otabe/Ribes |
TFP extinction ratio measured |
|
Transport fixture for OMC |
Somiya |
Not yet |
|
PD Mounts |
Somiya |
Excelitas PD pin location should be checked |
|
QPD Mounts |
Somiya |
QPD pin location should be checked |
|
Control system for OMC ASC |
Not yet |
||
OMC suspension frame |
Somiya |
Tested some examples but not easy |
|
Cablings |
Somiya+someone |
Dsub connectors and AWG32 cables ordered; to be test-manufactured at TT |
|
OFI spacer |
Somiya |
Not yet |
|
OMC installation |
Planned in Sep-Oct 2018 |
||
OFI installation |
Planned in Sep 2018 or earlier |
||
Beacon signal simulation |
Not yet |
||
Cross-check of the OMC calculations |
Not yet |
||
Digital system for OMC |
Not yet |