Task List for Phase-1 OMC and OFI (updated 18/3/12)
tasks |
person in charge |
due date |
status |
OMMT1/2 mirrors |
Hirose |
to be delivered in March |
|
OMMT1/2 suspensions |
Ohishi |
planned to be manufactured in fall 2018 |
|
OSTM bluk |
Hirose |
to be delivered to ICRR on April 5 |
|
OSTM polish/coating |
Hirose |
to be ordered in April |
|
OSTM suspensions |
Ohishi |
planned to be manufactured in fall 2018 |
|
Pillars for output optics |
Somiya |
Al blocks delivered and sent to TT machine shop |
|
In-vac RF PD/QPDs |
Michimura |
Not yet |
|
OFI breadboard |
Somiya |
designing |
|
OFI TFP mounts |
Somiya |
new mounts being designed |
|
OFI input/output baffle |
Somiya |
being designed |
|
OFI beam dump |
Somiya |
being considered |
|
OFI optical properties |
Otabe/Ribes |
TFP extinction ratio measured |
|
OFI spacer |
Somiya |
Not yet |
|
OFI installation |
Planned in Sep 2018 or earlier |
||
OMC transport fixture |
Somiya |
Not yet |
|
OMC PD Mounts |
Somiya |
Excelitas PD pin location should be checked |
|
OMC QPD Mounts |
Somiya |
QPD pin location should be checked |
|
OMC beam dump |
Delivered to TT |
||
OMC LSC |
Partially done |
||
OMC ASC |
Not yet |
||
OMC suspension frame |
Somiya |
Tested some examples but not easy |
|
OMC Cablings |
Somiya+someone |
Dsub connectors and AWG32 cables ordered; to be test-manufactured at TT |
|
OMC installation |
Planned in Sep-Oct 2018 |
||
Beacon signal simulation |
Not yet |
||
Cross-check of the OMC/OFI calculations |
Not yet |
||
Digital system for OMC |
Not yet |
Task List for Phase-2 OMC and OFI (updated 18/3/12)
OFI suspension |
Not yet |
||
OFI suspension frame |
Not yet |
||
OMC silica breadboard |
to be ordered in March |
||
OMC actuator |
Not yet |