=== Task List for Phase-1 OMC and OFI (updated 18/3/12) === | === Task List for Phase-1 OMC and OFI (updated 18/3/13) === |
Line 3: | Line 3: |
||OMMT1/2 mirrors||<:>Hirose||<:>||to be delivered in March|| ||OMMT1/2 suspensions||<:>Ohishi||<:>||planned to be manufactured in fall 2018|| ||OSTM bluk||<:>Hirose||<:>||to be delivered to ICRR on April 5|| ||OSTM polish/coating||<:>Hirose||<:>||to be ordered in April|| ||OSTM suspensions||<:>Ohishi||<:>||planned to be manufactured in fall 2018|| ||Pillars for output optics||<:>Somiya||<:>||Al blocks delivered and sent to TT machine shop|| ||In-vac RF PD/QPDs||<:>Michimura||<:>||Not yet|| ||OFI breadboard||<:>Somiya||<:>||designing|| ||OFI TFP mounts||<:>Somiya||<:>||new mounts being designed|| ||OFI input/output baffle||<:>Somiya||<:>||being designed|| ||OFI beam dump||<:>Somiya||<:>||being considered|| ||OFI optical properties||<:>Otabe/Ribes||<:>||TFP extinction ratio measured|| ||OFI spacer||<:>Somiya||<:>||Not yet|| ||OFI installation||<:>||<:>||Planned in Sep 2018 or earlier|| ||OMC transport fixture||<:>Somiya||<:>||Not yet|| ||OMC PD Mounts||<:>Somiya||<:>||Excelitas PD pin location should be checked|| ||OMC QPD Mounts||<:>Somiya||<:>||QPD pin location should be checked|| ||OMC beam dump||<:>||<:>||Delivered to TT|| ||OMC LSC||<:>||<:>||Partially done|| ||OMC ASC||<:>||<:>||Not yet|| ||OMC suspension frame||<:>Somiya||<:>||Tested some examples but not easy|| ||OMC Cablings||<:>Somiya+someone||<:>||Dsub connectors and AWG32 cables ordered; to be test-manufactured at TT|| ||OMC installation||<:>||<:>||Planned in Sep-Oct 2018|| ||Beacon signal simulation||<:>||<:>||Not yet|| |
||OMMT1/2 mirrors||<:>Hirose||<:>end March||to be delivered in March|| ||OMMT1/2 suspensions||<:>Ohishi||<:>3Q 2018||planned to be manufactured in fall 2018|| ||OSTM bluk||<:>Hirose/Somiya||<:>April||to be delivered to ICRR on April 5|| ||OSTM polish/coating||<:>Hirose||<:>3Q 2018||to be ordered in April|| ||OSTM suspensions||<:>Ohishi||<:>4Q 2018||planned to be manufactured in fall 2018|| ||Pillars for output optics||<:>Somiya||<:>2Q 2018||Al blocks delivered and sent to TT machine shop|| ||In-vac RF PD/QPDs||<:>Michimura||<:>3Q 2018||Not yet|| ||OFI breadboard||<:>Somiya||<:>1Q 2018||designing|| ||OFI TFP mounts||<:>Somiya||<:>1Q 2018||new mounts being designed|| ||OFI input/output baffle||<:>Somiya||<:>1Q 2018||being designed|| ||OFI beam dump||<:>Somiya||<:>1Q 2018||being considered|| ||OFI optical properties||<:>Otabe/Ribes||<:>1Q 2018||TFP extinction ratio measured|| ||OFI spacer||<:>Somiya||<:>1Q 2018||Not yet|| ||OFI installation||<:>||<:>3Q 2018||Planned in Sep 2018 or earlier|| ||OMC transport fixture||<:>Somiya||<:>3Q 2018||Not yet|| ||OMC PD Mounts||<:>Somiya||<:>2Q 2018||Excelitas PD pin location should be checked|| ||OMC QPD Mounts||<:>Somiya||<:>2Q 2018||QPD pin location should be checked|| ||OMC beam dump||<:>Somiya||<:>1Q 2018||Delivered to TT|| ||OMC LSC||<:>||<:>2020||Partially done|| ||OMC ASC||<:>||<:>2020||Not yet|| ||OMC suspension frame||<:>Somiya||<:>3Q 2018||Tested some examples but not easy|| ||OMC Cablings||<:>Somiya+someone||<:>3Q 2018||Dsub connectors and AWG32 cables ordered; to be test-manufactured at TT|| ||OMC installation||<:>||<:>4Q 2018||Planned in Sep-Oct 2018|| ||RF readout path setup||<:>||<:>4Q 2018|||| ||Beacon signal simulation||<:>Kirii||<:>||Not yet|| |
Line 28: | Line 29: |
||Digital system for OMC||<:>||<:>||Not yet|| | ||Digital system for OMC||<:>Kirii||<:>||Not yet|| |
Line 30: | Line 31: |
=== Task List for Phase-2 OMC and OFI (updated 18/3/12) === | === Task List for Phase-2 OMC and OFI (updated 18/3/13) === |
Line 33: | Line 34: |
||OMC silica breadboard||<:>||<:>||to be ordered in March|| | ||OMC silica breadboard||<:>Somiya||<:>3Q 2018||to be ordered in March|| |
Task List for Phase-1 OMC and OFI (updated 18/3/13)
tasks |
person in charge |
due date |
status |
OMMT1/2 mirrors |
Hirose |
end March |
to be delivered in March |
OMMT1/2 suspensions |
Ohishi |
3Q 2018 |
planned to be manufactured in fall 2018 |
OSTM bluk |
Hirose/Somiya |
April |
to be delivered to ICRR on April 5 |
OSTM polish/coating |
Hirose |
3Q 2018 |
to be ordered in April |
OSTM suspensions |
Ohishi |
4Q 2018 |
planned to be manufactured in fall 2018 |
Pillars for output optics |
Somiya |
2Q 2018 |
Al blocks delivered and sent to TT machine shop |
In-vac RF PD/QPDs |
Michimura |
3Q 2018 |
Not yet |
OFI breadboard |
Somiya |
1Q 2018 |
designing |
OFI TFP mounts |
Somiya |
1Q 2018 |
new mounts being designed |
OFI input/output baffle |
Somiya |
1Q 2018 |
being designed |
OFI beam dump |
Somiya |
1Q 2018 |
being considered |
OFI optical properties |
Otabe/Ribes |
1Q 2018 |
TFP extinction ratio measured |
OFI spacer |
Somiya |
1Q 2018 |
Not yet |
OFI installation |
3Q 2018 |
Planned in Sep 2018 or earlier |
|
OMC transport fixture |
Somiya |
3Q 2018 |
Not yet |
OMC PD Mounts |
Somiya |
2Q 2018 |
Excelitas PD pin location should be checked |
OMC QPD Mounts |
Somiya |
2Q 2018 |
QPD pin location should be checked |
OMC beam dump |
Somiya |
1Q 2018 |
Delivered to TT |
OMC LSC |
2020 |
Partially done |
|
OMC ASC |
2020 |
Not yet |
|
OMC suspension frame |
Somiya |
3Q 2018 |
Tested some examples but not easy |
OMC Cablings |
Somiya+someone |
3Q 2018 |
Dsub connectors and AWG32 cables ordered; to be test-manufactured at TT |
OMC installation |
4Q 2018 |
Planned in Sep-Oct 2018 |
|
RF readout path setup |
4Q 2018 |
||
Beacon signal simulation |
Kirii |
Not yet |
|
Cross-check of the OMC/OFI calculations |
Not yet |
||
Digital system for OMC |
Kirii |
Not yet |
Task List for Phase-2 OMC and OFI (updated 18/3/13)
OFI suspension |
Not yet |
||
OFI suspension frame |
Not yet |
||
OMC silica breadboard |
Somiya |
3Q 2018 |
to be ordered in March |
OMC actuator |
Not yet |