837
Comment:
|
870
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
||<:>item||<:>state|| | ||<:>tasks||<:>status||<:>person in charge||due date|| |
Task List for OMC and OFI (updated 18/3/11)
tasks |
status |
person in charge |
due date |
Design a post |
Not yet |
||
Make a breadboard for OFI |
Not yet |
||
Check the extinction ratio of OFI |
Not yet |
||
Design and make the Transport fixture for OMC |
On going |
||
Make a mount for PD(for OMC) |
Not yet |
||
Make a QPD for monitoring alignment of OMC |
Not yet |
||
Make a control system for alignment of OMC |
Not yet |
||
Design a frame of suspension for OMC |
On going |
||
Control test and cabling (in Air and vacuum) |
Not yet |
||
Make a suspension for OFI |
Not yet |
||
Install OMC and its suspension |
Not yet |
||
Install OFI and its suspension |
Not yet |
||
Simulation of control MIF using beacon signal |
Not yet |
||
Check the all calculation by Somiya-san about OMC |
Not yet |
||
Make a control system for OMC in Digital system |
Not yet |