||<:>tasks||<:>status||<:>person in charge||due date|| ||Design a post||Not yet|| ||Make a breadboard for OFI||Not yet|| ||Check the extinction ratio of OFI||Not yet|| ||Design and make the Transport fixture for OMC||On going|| ||Make a mount for PD(for OMC)||Not yet|| ||Make a QPD for monitoring alignment of OMC||Not yet|| ||Make a control system for alignment of OMC||Not yet|| ||Design a frame of suspension for OMC||On going|| ||Control test and cabling (in Air and vacuum)||Not yet|| ||Make a suspension for OFI||Not yet|| ||Install OMC and its suspension||Not yet|| ||Install OFI and its suspension||Not yet|| ||Simulation of control MIF using beacon signal||Not yet|| ||Check the all calculation by Somiya-san about OMC||Not yet|| ||Make a control system for OMC in Digital system||Not yet|| |
||<:>tasks||<:>person in charge||due date||<:>status|| ||Pillars for output optics||<:>||<:>||Not yet|| ||OFI breadboard||<:>||<:>||Not yet|| ||OFI optical properties||<:>||<:>||Not yet|| ||Transport fixture for OMC||<:>||<:>||On going|| ||PD Mounts||<:>||<:>||Not yet|| ||QPD Mounts||<:>||<:>||Not yet|| ||Control system for OMC ASC||<:>||<:>||Not yet|| ||OMC suspension frame||<:>||<:>||On going|| ||Cablings||<:>||<:>||Not yet|| ||OFI spacer||<:>||<:>||Not yet|| ||OMC installation||<:>||<:>||Not yet|| ||OFI installation||<:>||<:>||Not yet|| ||Beacon signal simulation||<:>||<:>||Not yet|| ||Cross-check of the OMC calculations||<:>||<:>||Not yet|| ||Make a control system for OMC in Digital system||<:>||<:>||Not yet|| |
Task List for OMC and OFI (updated 18/3/11)
tasks |
person in charge |
due date |
status |
Pillars for output optics |
Not yet |
||
OFI breadboard |
Not yet |
||
OFI optical properties |
Not yet |
||
Transport fixture for OMC |
On going |
||
PD Mounts |
Not yet |
||
QPD Mounts |
Not yet |
||
Control system for OMC ASC |
Not yet |
||
OMC suspension frame |
On going |
||
Cablings |
Not yet |
||
OFI spacer |
Not yet |
||
OMC installation |
Not yet |
||
OFI installation |
Not yet |
||
Beacon signal simulation |
Not yet |
||
Cross-check of the OMC calculations |
Not yet |
||
Make a control system for OMC in Digital system |
Not yet |