||<:>tasks||<:>status||<:>person in charge||due date||
||Design a post||Not yet||
||Make a breadboard for OFI||Not yet||
||Check the extinction ratio of OFI||Not yet||
||Design and make the Transport fixture for OMC||On going||
||Make a mount for PD(for OMC)||Not yet||
||Make a QPD for monitoring alignment of OMC||Not yet||
||Make a control system for alignment of OMC||Not yet||
||Design a frame of suspension for OMC||On going||
||Control test and cabling (in Air and vacuum)||Not yet||
||Make a suspension for OFI||Not yet||
||Install OMC and its suspension||Not yet||
||Install OFI and its suspension||Not yet||
||Simulation of control MIF using beacon signal||Not yet||
||Check the all calculation by Somiya-san about OMC||Not yet||
||Make a control system for OMC in Digital system||Not yet||
||<:>tasks||<:>person in charge||due date||<:>status||
||Pillars for output optics||<:>||<:>||Not yet||
||OFI breadboard||<:>||<:>||Not yet||
||OFI optical properties||<:>||<:>||Not yet||
||Transport fixture for OMC||<:>||<:>||On going||
||PD Mounts||<:>||<:>||Not yet||
||QPD Mounts||<:>||<:>||Not yet||
||Control system for OMC ASC||<:>||<:>||Not yet||
||OMC suspension frame||<:>||<:>||On going||
||Cablings||<:>||<:>||Not yet||
||OFI spacer||<:>||<:>||Not yet||
||OMC installation||<:>||<:>||Not yet||
||OFI installation||<:>||<:>||Not yet||
||Beacon signal simulation||<:>||<:>||Not yet||
||Cross-check of the OMC calculations||<:>||<:>||Not yet||
||Make a control system for OMC in Digital system||<:>||<:>||Not yet||

Task List for OMC and OFI (updated 18/3/11)

tasks

person in charge

due date

status

Pillars for output optics

Not yet

OFI breadboard

Not yet

OFI optical properties

Not yet

Transport fixture for OMC

On going

PD Mounts

Not yet

QPD Mounts

Not yet

Control system for OMC ASC

Not yet

OMC suspension frame

On going

Cablings

Not yet

OFI spacer

Not yet

OMC installation

Not yet

OFI installation

Not yet

Beacon signal simulation

Not yet

Cross-check of the OMC calculations

Not yet

Make a control system for OMC in Digital system

Not yet