Line 3: Line 3:
||Pillars for output optics||<:>||<:>||Not yet||
||OFI breadboard||<:>||<:>||Not yet||
||OFI optical properties||<:>||<:>||Not yet||
||Transport fixture for OMC||<:>||<:>||On going||
||PD Mounts||<:>||<:>||Not yet||
||QPD Mounts||<:>||<:>||Not yet||
||Control system for OMC ASC||<:>||<:>||Not yet||
||OMC suspension frame||<:>||<:>||On going||
||Cablings||<:>||<:>||Not yet||
||OFI spacer||<:>||<:>||Not yet||
||OMC installation||<:>||<:>||Not yet||
||OFI installation||<:>||<:>||Not yet||
||Beacon signal simulation||<:>||<:>||Not yet||
||Cross-check of the OMC calculations||<:>||<:>||Not yet||
||Digital system for OMC||<:>||<:>||Not yet||
||Pillars for output optics||<:>Somiya||<:>||Al blocks delivered and sent to TT machine shop||
||OFI breadboard||<:>Somiya||<:>||<:>designing||
||OFI optical properties||<:>||<:>||<:>Not yet||
||Transport fixture for OMC||<:>||<:>||<:>On going||
||PD Mounts||<:>||<:>||<:>Not yet||
||QPD Mounts||<:>||<:>||<:>Not yet||
||Control system for OMC ASC||<:>||<:>||<:>Not yet||
||OMC suspension frame||<:>||<:>||<:>On going||
||Cablings||<:>||<:>||<:>Not yet||
||OFI spacer||<:>||<:>||<:>Not yet||
||OMC installation||<:>||<:>||<:>Not yet||
||OFI installation||<:>||<:>||<:>Not yet||
||Beacon signal simulation||<:>||<:>||<:>Not yet||
||Cross-check of the OMC calculations||<:>||<:>||<:>Not yet||
||Digital system for OMC||<:>||<:>||<:>Not yet||

Task List for OMC and OFI (updated 18/3/11)

tasks

person in charge

due date

status

Pillars for output optics

Somiya

Al blocks delivered and sent to TT machine shop

OFI breadboard

Somiya

designing

OFI optical properties

Not yet

Transport fixture for OMC

On going

PD Mounts

Not yet

QPD Mounts

Not yet

Control system for OMC ASC

Not yet

OMC suspension frame

On going

Cablings

Not yet

OFI spacer

Not yet

OMC installation

Not yet

OFI installation

Not yet

Beacon signal simulation

Not yet

Cross-check of the OMC calculations

Not yet

Digital system for OMC

Not yet