=== Task List for OMC and OFI (updated 18/3/11) === | === Task List for OMC and OFI (updated 18/3/12) === |
Task List for OMC and OFI (updated 18/3/12)
tasks |
person in charge |
due date |
status |
Pillars for output optics |
Somiya |
Al blocks delivered and sent to TT machine shop |
|
OFI breadboard |
Somiya |
designing |
|
OFI optical properties |
Otabe/Ribes |
TFP extinction ratio measured |
|
Transport fixture for OMC |
Somiya |
Not yet |
|
PD Mounts |
Somiya |
Excelitas PD pin location should be checked |
|
QPD Mounts |
Somiya |
QPD pin location should be checked |
|
Control system for OMC ASC |
Not yet |
||
OMC suspension frame |
Somiya |
Tested some examples but not easy |
|
Cablings |
Somiya+someone |
Dsub connectors and AWG32 cables ordered; to be test-manufactured at TT |
|
OFI spacer |
Somiya |
Not yet |
|
OMC installation |
Planned in Sep-Oct 2018 |
||
OFI installation |
Planned in Sep 2018 or earlier |
||
Beacon signal simulation |
Not yet |
||
Cross-check of the OMC calculations |
Not yet |
||
Digital system for OMC |
Not yet |