Differences between revisions 1 and 17 (spanning 16 versions)
Revision 1 as of 2018-10-12 21:37:34
Size: 165
Comment:
Revision 17 as of 2018-10-18 00:27:14
Size: 1326
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Installation work 2018/10-11 = Installation work 2018/10-11 =
Line 3: Line 3:
=== Installation plan === Installation plan ===
Line 6: Line 6:

=== Installation work ===

[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0091/T1809176/002/sentitems.txt|Items sent from TT to KAGRA]]

[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0091/T1809176/003/Book1.pdf|Screws purchased for OMC/OFI]]

[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0091/T1809176/004/FromChart4.pdf|Wiring diagram]]

[[attachment:GR5036-000A.pdf|Drawings of the frame]]

[[attachment:GR5096-000B4.pdf|Drawings of the frame in the OMC chamber]]

[[attachment:180525_output optics saito.xlsx|Coordinates by Saito-san]]

=== Notes ===

 * It turned out that the Table B is to be moved to the SR2 area for ALS (10/11)

 * Miyoki-san suggested to use an uninterruptible power supply for the omc laser (10/12)

 * Akutsu-kun suggested to simply remove a blank flange instead of installing a viewport for the laser injection; Saito-san agreed (10/12)

 * One of the feedthrough flanges on the OMC chamber is not tightly connected as there will be one more cable connected to it for a picomotor (10/16)

 * The feedthroughs cannot be directly connected to the KAGRA Dsub cable; there should be a gender changer inbetween (10/17)

Installation work 2018/10-11

Installation plan

Installation Document

Installation work

Items sent from TT to KAGRA

Screws purchased for OMC/OFI

Wiring diagram

Drawings of the frame

Drawings of the frame in the OMC chamber

Coordinates by Saito-san

Notes

  • It turned out that the Table B is to be moved to the SR2 area for ALS (10/11)
  • Miyoki-san suggested to use an uninterruptible power supply for the omc laser (10/12)
  • Akutsu-kun suggested to simply remove a blank flange instead of installing a viewport for the laser injection; Saito-san agreed (10/12)
  • One of the feedthrough flanges on the OMC chamber is not tightly connected as there will be one more cable connected to it for a picomotor (10/16)
  • The feedthroughs cannot be directly connected to the KAGRA Dsub cable; there should be a gender changer inbetween (10/17)

KAGRA/Subgroups/IOO/OMC/installation (last edited 2019-11-15 10:24:08 by KentaroSomiya)