= Installation work 2018/10-11 = Installation work 2018/10-11 =
Line 3: Line 3:
=== Installation plan === Installation plan ===
Line 6: Line 6:

=== Installation work ===

[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0091/T1809176/002/sentitems.txt|Items sent from TT to KAGRA]]

[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0091/T1809176/003/Book1.pdf|Screws purchased for OMC/OFI]]

[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0091/T1809176/006/Chart6.pdf|Wiring diagram]]

[[attachment:GR5036-000A.pdf|Drawings of the frame]]

[[attachment:GR5096-000B4.pdf|Drawings of the frame in the OMC chamber]]

[[attachment:180525_output optics saito.xlsx|Coordinates by Saito-san]]

=== Notes ===

 * Miyoki-san suggested to use an uninterruptible power supply for the omc laser (10/12)

 * Akutsu-kun suggested to simply remove a blank flange instead of installing a viewport for the laser injection; Saito-san agreed (10/12)

 * One of the feedthrough flanges on the OMC chamber is not tightly connected as there will be one more cable connected to it for a picomotor (10/16)

 * The feedthroughs cannot be directly connected to the KAGRA Dsub cable; there should be a gender changer inbetween (10/17)

 * We moved the Optical Table B (POS table) out from the OMC area; it will be moved to the BS area on Nov 8-9 (10/31)

 * PD/QPD in-air cables should be relocated so as to have the female connectors to the feedthrough (11/1)

 * Piezo Driver setup is supposed to "1001" but was "1000" by accident, which means the input voltage was +/-2.5V instead of +/-5V (11/7)

Installation work 2018/10-11

Installation plan

Installation Document

Installation work

Items sent from TT to KAGRA

Screws purchased for OMC/OFI

Wiring diagram

Drawings of the frame

Drawings of the frame in the OMC chamber

Coordinates by Saito-san

Notes

  • Miyoki-san suggested to use an uninterruptible power supply for the omc laser (10/12)
  • Akutsu-kun suggested to simply remove a blank flange instead of installing a viewport for the laser injection; Saito-san agreed (10/12)
  • One of the feedthrough flanges on the OMC chamber is not tightly connected as there will be one more cable connected to it for a picomotor (10/16)
  • The feedthroughs cannot be directly connected to the KAGRA Dsub cable; there should be a gender changer inbetween (10/17)
  • We moved the Optical Table B (POS table) out from the OMC area; it will be moved to the BS area on Nov 8-9 (10/31)
  • PD/QPD in-air cables should be relocated so as to have the female connectors to the feedthrough (11/1)
  • Piezo Driver setup is supposed to "1001" but was "1000" by accident, which means the input voltage was +/-2.5V instead of +/-5V (11/7)