Size: 999
Comment:
|
Size: 1472
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 15: | Line 15: |
[[attachment:GR5036-000A.pdf|Drawings]] | [[attachment:GR5036-000A.pdf|Drawings of the frame]] [[attachment:GR5096-000B4.pdf|Drawings of the frame in the OMC chamber]] [[attachment:180525_output optics saito.xlsx|Coordinates by Saito-san]] |
Line 18: | Line 22: |
* It turned out that the Table B is to be moved to the SR2 area for ALS (10/11) |
|
Line 25: | Line 27: |
* We found that we need two more male pin (accuglass, 100171) to connect the PZT cables to the Dsub cable (10/12) | * One of the feedthrough flanges on the OMC chamber is not tightly connected as there will be one more cable connected to it for a picomotor (10/16) * The feedthroughs cannot be directly connected to the KAGRA Dsub cable; there should be a gender changer inbetween (10/17) * We moved the Optical Table B (POS table) out from the OMC area; it will be moved to the BS area on Nov 8-9 (10/31) * PD/QPD in-air cables should be relocated so as to have the female connectors to the feedthrough (11/1) |
Installation work 2018/10-11
Installation plan
Installation work
Drawings of the frame in the OMC chamber
Notes
- Miyoki-san suggested to use an uninterruptible power supply for the omc laser (10/12)
- Akutsu-kun suggested to simply remove a blank flange instead of installing a viewport for the laser injection; Saito-san agreed (10/12)
- One of the feedthrough flanges on the OMC chamber is not tightly connected as there will be one more cable connected to it for a picomotor (10/16)
- The feedthroughs cannot be directly connected to the KAGRA Dsub cable; there should be a gender changer inbetween (10/17)
- We moved the Optical Table B (POS table) out from the OMC area; it will be moved to the BS area on Nov 8-9 (10/31)
- PD/QPD in-air cables should be relocated so as to have the female connectors to the feedthrough (11/1)