Differences between revisions 16 and 17
Revision 16 as of 2018-10-17 20:50:46
Size: 1251
Comment:
Revision 17 as of 2018-10-18 00:27:14
Size: 1326
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
[[attachment:180525_output optics saito.xlsx|Coordinates by Saito-san]]

Installation work 2018/10-11

Installation plan

Installation Document

Installation work

Items sent from TT to KAGRA

Screws purchased for OMC/OFI

Wiring diagram

Drawings of the frame

Drawings of the frame in the OMC chamber

Coordinates by Saito-san

Notes

  • It turned out that the Table B is to be moved to the SR2 area for ALS (10/11)
  • Miyoki-san suggested to use an uninterruptible power supply for the omc laser (10/12)
  • Akutsu-kun suggested to simply remove a blank flange instead of installing a viewport for the laser injection; Saito-san agreed (10/12)
  • One of the feedthrough flanges on the OMC chamber is not tightly connected as there will be one more cable connected to it for a picomotor (10/16)
  • The feedthroughs cannot be directly connected to the KAGRA Dsub cable; there should be a gender changer inbetween (10/17)

KAGRA/Subgroups/IOO/OMC/installation (last edited 2019-11-15 10:24:08 by KentaroSomiya)