[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0091/T1809176/003/Book1.pdf|Screws purchased for OMC/OFI]] [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0091/T1809176/004/FromChart4.pdf|Wiring diagram]] [[attachment:GR5036-000A.pdf|Drawings of the frame]] [[attachment:GR5096-000B4.pdf|Drawings of the frame in the OMC chamber]] === Notes === * It turned out that the Table B is to be moved to the SR2 area for ALS (10/11) * Miyoki-san suggested to use an uninterruptible power supply for the omc laser (10/12) * Akutsu-kun suggested to simply remove a blank flange instead of installing a viewport for the laser injection; Saito-san agreed (10/12) * One of the feedthrough flanges on the OMC chamber is not tightly connected as there will be one more cable connected to it for a picomotor (10/16) * The feedthroughs cannot be directly connected to the KAGRA Dsub cable; there should be a gender changer inbetween (10/17) |
Installation work 2018/10-11
Installation plan
Installation work
Drawings of the frame in the OMC chamber
Notes
- It turned out that the Table B is to be moved to the SR2 area for ALS (10/11)
- Miyoki-san suggested to use an uninterruptible power supply for the omc laser (10/12)
- Akutsu-kun suggested to simply remove a blank flange instead of installing a viewport for the laser injection; Saito-san agreed (10/12)
- One of the feedthrough flanges on the OMC chamber is not tightly connected as there will be one more cable connected to it for a picomotor (10/16)
- The feedthroughs cannot be directly connected to the KAGRA Dsub cable; there should be a gender changer inbetween (10/17)