Differences between revisions 5 and 6
Revision 5 as of 2018-10-12 22:41:51
Size: 409
Comment:
Revision 6 as of 2018-10-12 22:52:21
Size: 852
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:

=== Notes ===

- It turned out that the Table B is to be moved to the SR2 area for ALS (10/11)
- Miyoki-san suggested to use an uninterruptible power supply for the omc laser (10/12)
- Akutsu-kun suggested to simply remove a blank flange instead of installing a viewport for the laser injection; Saito-san agreed (10/12)
- We found that we need two more male pin (accuglass, 100171) to connect the PZT cables to the Dsub cable (10/12)

Installation work 2018/10-11

Installation plan

Installation Document

Installation work

Items sent from TT to KAGRA

Screws purchased for OMC/OFI

Notes

- It turned out that the Table B is to be moved to the SR2 area for ALS (10/11) - Miyoki-san suggested to use an uninterruptible power supply for the omc laser (10/12) - Akutsu-kun suggested to simply remove a blank flange instead of installing a viewport for the laser injection; Saito-san agreed (10/12) - We found that we need two more male pin (accuglass, 100171) to connect the PZT cables to the Dsub cable (10/12)

KAGRA/Subgroups/IOO/OMC/installation (last edited 2019-11-15 10:24:08 by KentaroSomiya)