= Installation work 2018/10-11 = === Installation plan === [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9176|Installation Document]] === Installation work === [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9176|Items sent from TT to KAGRA]] [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9176|Screws purchased for OMC/OFI]] [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9176|Wiring diagram]] [[attachment:GR5036-000A.pdf|Drawings of the frame]] [[attachment:GR5096-000B4.pdf|Drawings of the frame in the OMC chamber]] [[attachment:180525_output optics saito.xlsx|Coordinates by Saito-san]] === Notes === * Miyoki-san suggested to use an uninterruptible power supply for the omc laser (10/12) * Akutsu-kun suggested to simply remove a blank flange instead of installing a viewport for the laser injection; Saito-san agreed (10/12) * One of the feedthrough flanges on the OMC chamber is not tightly connected as there will be one more cable connected to it for a picomotor (10/16) * The feedthroughs cannot be directly connected to the KAGRA Dsub cable; there should be a gender changer inbetween (10/17) * We moved the Optical Table B (POS table) out from the OMC area; it will be moved to the BS area on Nov 8-9 (10/31) * PD/QPD in-air cables should be relocated so as to have the female connectors to the feedthrough (11/1) * Piezo Driver setup is supposed to "1001" but was "1000" by accident, which means the input voltage was +/-2.5V instead of +/-5V (11/7)