Size: 1192
Comment:
|
← Revision 46 as of 2023-06-22 13:24:12 ⇥
Size: 4753
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* [[KAGRA/Subgroups/IOO/OMC/meeting2018|2018]] == Installation work == * [[KAGRA/Subgroups/IOO/OMC/installation|2018/10-11]] |
|
Line 8: | Line 12: |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1875|Report by Kumeta]] (Japanese, 2013) * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2105|Report by Somiya]] (English, 2013) |
|
Line 11: | Line 13: |
=== Requirement === | * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8043|OMC Design Document]] * [[KAGRA/Subgroups/IOO/OMC/DCPDCalculation|DC PD]] == Requirement == |
Line 15: | Line 21: |
=== Optical Design (updated 17/10/25) === ||item||RoC||Beam Raidus|| ||OMMT1||13.16m||4.58mm|| ||OMMT2||44.39m||??mm|| ||OSTM||flat||TBA|| ||OMC1||flat||432um|| ||OMC2||flat||453um(X)/456um(Y)|| ||OMC3||1.80m||619um|| ||OMC4||1.80m||619um|| |
== Optical Design (updated 19/8/11) == ||item||RoC||Beam Raidus||Misc|| ||OMMT1||13.16m||4.46mm||Dia: 99.95mm, thick: 55.58(largest), wedge: 2.45deg (measured by Hirose-san 2018)|| ||OMMT2||44.39m||2.68mm||Dia: 99.97mm, thick: 55.08(largest), wedge: 3.3deg (measured by Hirose-san 2018)|| ||OSTM||flat||TBA|||| ||OMC1||flat||444um|||| ||OMC2||flat||444um(X)/447um(Y)|||| ||OMC3||1.80m||604um|||| ||OMC4||1.80m||604um|||| ||DCPD||--||592um|||| |
Line 36: | Line 43: |
=== Suspension Design === | == Suspension Design == |
Line 38: | Line 45: |
TBD | ||Total mass to be suspended||13kg|| ||Number of suspensions||3|| ||Blade spring size||220mm x 53mm|| ||Radius of curvature||190mm|| ||Distance from a blade end to a suspension wire||203.5mm|| ||Blade material||MAS-1|| ||Blade mass||4.3kg|| |
Line 40: | Line 53: |
=== Control Scheme === | * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7050|JGW-G1707050-v1]] |
Line 42: | Line 55: |
TBD | == Control Scheme == ||||LSC|| ||Dither frequency||1kHz (tentative)|| ||Dither optics||OMC3 or OMC4|| ||Signal extraction port||OMC trans DCPDs|| ||||ASC|| ||Dither frequency||not yet decided|| ||Dither optics||OSTM (tentative)|| ||Signal extraction port||OMC trans DCPDs; on-board QPDs are used for the course alignment|| == OMC Venting and Repumping Procedure with HPL preparation with PLL (2023/Jan/30~Feb/3) == * (Jan 30, Mon) * Before 9:00: FPMI realignment (Yokozawa-kun), Preparation for venting (Kimura-san, M.Takahashi-san), Turning on all FFUs in the OMC area. * Keep IMC lock using the present fiber laser. Stanby of R.Takahashi-san and Aso-kun for monitoring. * After informing the start of venting from Kimura-san to R. Takahashi-san, Kimura-san starts venting. * If OMMTs realignment with pico is necessary, It will be done. * After finishing venting, Kimura-san informs to R.Takahashi-san, Aso-kun, Miyakawa-kun and Miyoki. * Miyoki changes the PSL from OBS to Work mode at this time with IMC ASC? or around after all works are done on Jan 30? * IP2? HV drift monitoring. * Offload of IMC suspensions and IP1/2? * (Para)Just after the PSL mode change, Miyakawa-kun starts FB -> HPL changing and IMC control with HPL. * (Para)After closing the GV between SRM/SR2, Kimura-san starts opening the bellows at GV. So no laser to OMC area. Kimura-san starts the repair work. We would like to avoid removing the all bellows duct to reduce the risk to produce another leak on the healthy opposite side. * (Jan 31, Tue) * Kimura-san dose repair work and closes again. Also, after checking no problem happens in the vacuum level in SRM, the GV between SRM/SR2 is opened. Check the IR beam to and from OMC by ??. * Recover the operated FFU number in OMC as before this wrok. * After this work, R.Takahashi-san dose health check for OMC suspensions in this day or tomorrow morning * Miyakawa-kun PLL control adjustment with Izumi-kun. Sometimes, IMC unlock is expected? * The GR frequency will be kept, while the HPL IR frequency will be adjusted by changing the crystal temp. * (Feb 1, Wed) * Morning * Miyakawa-kun's HPL works. * Noontime * From 13:00?, Kimura-san informs R. Takahashi-san and Aso-kun about the start of pumping. The Kimura-san starts pumping gradually. * If OMMTs realignment with pico is necessary, It will be done. * (Feb 2, Thu) * Miyakawa-kun change the HPL to FB again? After this or earlier timing, the PSL room should be set to OBS mode again.(Or should we do in the week end holidays?) * Kimura-san/Yasui-san start the vacuum leak check. If no leak is verified, we will decide when we can open the GV, judging from the vacuum level reduction speed. * Opening GV might result in the realignment of the IF beam to OMC. * (Feb 3, Fri) * DGS maintenance day. == OMC Blade Damping (2023/June/22) == * Somiya-kun's Presentation * |
Output Mode-cleaner
Meetings
Installation work
Reports
Requirement
Shot noise increase due to the signal reduction by the OMC and residual spatial higher order modes after the OMC should be less than 5%.
Optical Design (updated 19/8/11)
item |
RoC |
Beam Raidus |
Misc |
OMMT1 |
13.16m |
4.46mm |
Dia: 99.95mm, thick: 55.58(largest), wedge: 2.45deg (measured by Hirose-san 2018) |
OMMT2 |
44.39m |
2.68mm |
Dia: 99.97mm, thick: 55.08(largest), wedge: 3.3deg (measured by Hirose-san 2018) |
OSTM |
flat |
TBA |
|
OMC1 |
flat |
444um |
|
OMC2 |
flat |
444um(X)/447um(Y) |
|
OMC3 |
1.80m |
604um |
|
OMC4 |
1.80m |
604um |
|
DCPD |
-- |
592um |
Space |
Distance |
AOI |
SRM-OMMT1 |
5.63m |
3.07deg |
OMMT1-OMMT2 |
2.60m |
3.07deg |
OMMT2-OSTM |
2.97m |
90deg |
OSTM-OBS1 |
0.30m |
90deg |
OBS1-OMC1 |
0.03m |
0.078deg |
OMC1-OMC2 |
0.357m |
3.00deg |
OMC2-OMC3 |
0.359m |
3.00deg |
OMC3-OMC4 |
0.357m |
3.00deg |
OMC4-OMC1 |
0.359m |
3.00deg |
Suspension Design
Total mass to be suspended |
13kg |
Number of suspensions |
3 |
Blade spring size |
220mm x 53mm |
Radius of curvature |
190mm |
Distance from a blade end to a suspension wire |
203.5mm |
Blade material |
MAS-1 |
Blade mass |
4.3kg |
Control Scheme
LSC |
|
Dither frequency |
1kHz (tentative) |
Dither optics |
OMC3 or OMC4 |
Signal extraction port |
OMC trans DCPDs |
ASC |
|
Dither frequency |
not yet decided |
Dither optics |
OSTM (tentative) |
Signal extraction port |
OMC trans DCPDs; on-board QPDs are used for the course alignment |
OMC Venting and Repumping Procedure with HPL preparation with PLL (2023/Jan/30~Feb/3)
- (Jan 30, Mon)
- Before 9:00: FPMI realignment (Yokozawa-kun), Preparation for venting (Kimura-san, M.Takahashi-san), Turning on all FFUs in the OMC area.
- Keep IMC lock using the present fiber laser. Stanby of R.Takahashi-san and Aso-kun for monitoring.
- After informing the start of venting from Kimura-san to R. Takahashi-san, Kimura-san starts venting.
- If OMMTs realignment with pico is necessary, It will be done.
- After finishing venting, Kimura-san informs to R.Takahashi-san, Aso-kun, Miyakawa-kun and Miyoki.
- Miyoki changes the PSL from OBS to Work mode at this time with IMC ASC? or around after all works are done on Jan 30?
- IP2? HV drift monitoring.
- Offload of IMC suspensions and IP1/2?
(Para)Just after the PSL mode change, Miyakawa-kun starts FB -> HPL changing and IMC control with HPL.
- (Para)After closing the GV between SRM/SR2, Kimura-san starts opening the bellows at GV. So no laser to OMC area. Kimura-san starts the repair work. We would like to avoid removing the all bellows duct to reduce the risk to produce another leak on the healthy opposite side.
- (Jan 31, Tue)
- Kimura-san dose repair work and closes again. Also, after checking no problem happens in the vacuum level in SRM, the GV between SRM/SR2 is opened. Check the IR beam to and from OMC by ??.
- Recover the operated FFU number in OMC as before this wrok.
- After this work, R.Takahashi-san dose health check for OMC suspensions in this day or tomorrow morning
- Miyakawa-kun PLL control adjustment with Izumi-kun. Sometimes, IMC unlock is expected?
- The GR frequency will be kept, while the HPL IR frequency will be adjusted by changing the crystal temp.
- (Feb 1, Wed)
- Morning
- Miyakawa-kun's HPL works.
- Noontime
- From 13:00?, Kimura-san informs R. Takahashi-san and Aso-kun about the start of pumping. The Kimura-san starts pumping gradually.
- If OMMTs realignment with pico is necessary, It will be done.
- From 13:00?, Kimura-san informs R. Takahashi-san and Aso-kun about the start of pumping. The Kimura-san starts pumping gradually.
- Morning
- (Feb 2, Thu)
- Miyakawa-kun change the HPL to FB again? After this or earlier timing, the PSL room should be set to OBS mode again.(Or should we do in the week end holidays?)
- Kimura-san/Yasui-san start the vacuum leak check. If no leak is verified, we will decide when we can open the GV, judging from the vacuum level reduction speed.
- Opening GV might result in the realignment of the IF beam to OMC.
- (Feb 3, Fri)
- DGS maintenance day.
OMC Blade Damping (2023/June/22)
- Somiya-kun's Presentation