= Output Mode-cleaner = == Meetings == * [[KAGRA/Subgroups/IOO/OMC/meeting2016|2016]] * [[KAGRA/Subgroups/IOO/OMC/meeting2017|2017]] * [[KAGRA/Subgroups/IOO/OMC/meeting2018|2018]] == Installation work == * [[KAGRA/Subgroups/IOO/OMC/installation|2018/10-11]] == Reports == * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8043|OMC Design Document]] * [[KAGRA/Subgroups/IOO/OMC/DCPDCalculation|DC PD]] == Requirement == Shot noise increase due to the signal reduction by the OMC and residual spatial higher order modes after the OMC should be less than 5%. == Optical Design (updated 19/8/11) == ||item||RoC||Beam Raidus||Misc|| ||OMMT1||13.16m||4.46mm||Dia: 99.95mm, thick: 55.58(largest), wedge: 2.45deg (measured by Hirose-san 2018)|| ||OMMT2||44.39m||2.68mm||Dia: 99.97mm, thick: 55.08(largest), wedge: 3.3deg (measured by Hirose-san 2018)|| ||OSTM||flat||TBA|||| ||OMC1||flat||444um|||| ||OMC2||flat||444um(X)/447um(Y)|||| ||OMC3||1.80m||604um|||| ||OMC4||1.80m||604um|||| ||DCPD||--||592um|||| ||Space||Distance||AOI|| ||SRM-OMMT1||5.63m||3.07deg|| ||OMMT1-OMMT2||2.60m||3.07deg|| ||OMMT2-OSTM||2.97m||90deg|| ||OSTM-OBS1||0.30m||90deg|| ||OBS1-OMC1||0.03m||0.078deg|| ||OMC1-OMC2||0.357m||3.00deg|| ||OMC2-OMC3||0.359m||3.00deg|| ||OMC3-OMC4||0.357m||3.00deg|| ||OMC4-OMC1||0.359m||3.00deg|| == Suspension Design == ||Total mass to be suspended||13kg|| ||Number of suspensions||3|| ||Blade spring size||220mm x 53mm|| ||Radius of curvature||190mm|| ||Distance from a blade end to a suspension wire||203.5mm|| ||Blade material||MAS-1|| ||Blade mass||4.3kg|| * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7050|JGW-G1707050-v1]] == Control Scheme == ||||LSC|| ||Dither frequency||1kHz (tentative)|| ||Dither optics||OMC3 or OMC4|| ||Signal extraction port||OMC trans DCPDs|| ||||ASC|| ||Dither frequency||not yet decided|| ||Dither optics||OSTM (tentative)|| ||Signal extraction port||OMC trans DCPDs; on-board QPDs are used for the course alignment|| == OMC Venting and Repumping Procedure with HPL preparation with PLL (2023/Jan/30~Feb/3) == * (Jan 30, Mon) * Before 9:00: FPMI realignment (Yokozawa-kun), Preparation for venting (Kimura-san, M.Takahashi-san), Turning on all FFUs in the OMC area. * Keep IMC lock using the present fiber laser. Stanby of R.Takahashi-san and Aso-kun for monitoring. * After informing the start of venting from Kimura-san to R. Takahashi-san, Kimura-san starts venting. * If OMMTs realignment with pico is necessary, It will be done. * After finishing venting, Kimura-san informs to R.Takahashi-san, Aso-kun, Miyakawa-kun and Miyoki. * Miyoki changes the PSL from OBS to Work mode at this time with IMC ASC? or around after all works are done on Jan 30? * IP2? HV drift monitoring. * Offload of IMC suspensions and IP1/2? * (Para)Just after the PSL mode change, Miyakawa-kun starts FB -> HPL changing and IMC control with HPL. * (Para)After closing the GV between SRM/SR2, Kimura-san starts opening the bellows at GV. So no laser to OMC area. Kimura-san starts the repair work. We would like to avoid removing the all bellows duct to reduce the risk to produce another leak on the healthy opposite side. * (Jan 31, Tue) * Kimura-san dose repair work and closes again. Also, after checking no problem happens in the vacuum level in SRM, the GV between SRM/SR2 is opened. Check the IR beam to and from OMC by ??. * Recover the operated FFU number in OMC as before this wrok. * After this work, R.Takahashi-san dose health check for OMC suspensions in this day or tomorrow morning * Miyakawa-kun PLL control adjustment with Izumi-kun. Sometimes, IMC unlock is expected? * The GR frequency will be kept, while the HPL IR frequency will be adjusted by changing the crystal temp. * (Feb 1, Wed) * Morning * Miyakawa-kun's HPL works. * Noontime * From 13:00?, Kimura-san informs R. Takahashi-san and Aso-kun about the start of pumping. The Kimura-san starts pumping gradually. * If OMMTs realignment with pico is necessary, It will be done. * (Feb 2, Thu) * Miyakawa-kun change the HPL to FB again? After this or earlier timing, the PSL room should be set to OBS mode again.(Or should we do in the week end holidays?) * Kimura-san/Yasui-san start the vacuum leak check. If no leak is verified, we will decide when we can open the GV, judging from the vacuum level reduction speed. * Opening GV might result in the realignment of the IF beam to OMC. * (Feb 3, Fri) * DGS maintenance day. == OMC Blade Damping (2023/June/22) == * Somiya-kun's Presentation *