Size: 1430
Comment:
|
Size: 1569
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
||name ||size and height ||closest chamber ||beam height ||q-params/position/angle of the beams || ||MC front || 1.2 x 2.4m x h 0.940m ||MCF chamber || 1.134m - 0.012m || || ||MCT || 1m x 1m x h 0.955m ||MCE chamber || 1.149m - 0.027m || || |
||name ||size and height ||closest chamber ||beam height ||optical layout draing || ||MC front || 1.2 x 2.4m x h 0.940m ||MCF chamber || 1.134m - 0.012m ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3301|JGW-D1503301]]|| ||MCT || 1m x 1m x h 0.955m ||MCE chamber || 1.149m - 0.027m ||IMC TRANS:27.9850+16.8465i/465mm from PSL side edge/88.6689deg|| |
KAGRA Output Optical Tables
iKAGRA
name |
size and height |
closest chamber |
beam height |
optical layout draing |
MC front |
1.2 x 2.4m x h 0.940m |
MCF chamber |
1.134m - 0.012m |
|
MCT |
1m x 1m x h 0.955m |
MCE chamber |
1.149m - 0.027m |
IMC TRANS:27.9850+16.8465i/465mm from PSL side edge/88.6689deg |
REFL |
1.2 x 2.4m x h 0.947m |
IFI chamber |
1.141m - 0.019m |
|
IMMT2 |
1m x 1m x h 0.947m (temporary) |
IFI chamber |
1.141m - 0.019m |
|
SR2 |
1m x 1m x h 1.000m (temporary for iKAGRA AS) |
SR2 chamber |
1.217m |
|
ETMX |
1m x 1m x h 0.986m (temporary) |
EXA chamber |
1.200m |
|
ETMY |
1m x 1m x h 0.986m (temporary) |
EYA chamber |
1.200m |
|
bKAGRA
name |
size and height |
closest chamber |
beam height |
|
POX |
1m x 1m x h 1.043m (temporary) |
SR3 chamber |
1.257m |
|
POY |
1m x 1m x h 0.936m (temporary) |
PR3 chamber |
1.150m |
|
POP |
1.2 x 2.4m x h 0.970m |
PR2 chamber |
1.184m |
|
POS |
1.2 x 2.4m x h 1.000m |
SR2 chamber |
1.217m |
|
AS |
1.2 x 2.4m x h 1.000m |
SRM chamber |
1.271m |
|
* Beam height written here is from the mortar surface.
* Mortar thickness is about 20mm by design.
* Difference between the beam height from the concrete surface and the height of the optical table should be larger than 7.6 inch (0.19m)
* See JGW-D1402607