||name ||size and height ||closest chamber ||beam height ||q-param/position/angle of the beams || ||MC front || 1.2 x 2.4m x h 0.940m ||MCF chamber || 1.134m - 0.012m ||IMC REFL: || ||MCT || 1m x 1m x h 0.955m ||MCE chamber || 1.149m - 0.027m || || |
||name ||size and height ||closest chamber ||beam height ||optical layout drawing / status || ||MC front || 1.2 x 2.4m x h 0.940m ||MCF chamber || 1.134m - 0.012m ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3301|JGW-D1503301]] / purchased(2014/10)|| ||MCT || 1m x 1m x h 0.955m ||MCE chamber || 1.149m - 0.027m ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3301|JGW-D1503301]] / purchased(2014/10)|| |
Line 7: | Line 7: |
||IMMT2 || 1m x 1m x h 0.947m (temporary) ||IFI chamber || 1.141m - 0.019m || || ||SR2 || 1m x 1m x h 1.000m (temporary for iKAGRA AS) ||SR2 chamber || 1.217m || || ||ETMX || 1m x 1m x h 0.986m (temporary) ||EXA chamber || 1.200m || || ||ETMY || 1m x 1m x h 0.986m (temporary) ||EYA chamber || 1.200m || || |
||IMMT2 || 1m x 1m x h 0.947m (temporary) ||IFI chamber || 1.141m - 0.019m ||purchased(2014/10) || |
Line 15: | Line 11: |
||ETMX || 1m x 1m x h 0.986m (temporary) ||EXA chamber || 1.200m || may use bigger table instead|| ||ETMY || 1m x 1m x h 0.986m (temporary) ||EYA chamber || 1.200m || may use bigger table instead|| |
|
Line 28: | Line 26: |
* iKAGRA AS table is omitted because we are not using AS port for iKAGRA 3km Michelson |
KAGRA Output Optical Tables
iKAGRA
name |
size and height |
closest chamber |
beam height |
optical layout drawing / status |
MC front |
1.2 x 2.4m x h 0.940m |
MCF chamber |
1.134m - 0.012m |
JGW-D1503301 / purchased(2014/10) |
MCT |
1m x 1m x h 0.955m |
MCE chamber |
1.149m - 0.027m |
JGW-D1503301 / purchased(2014/10) |
REFL |
1.2 x 2.4m x h 0.947m |
IFI chamber |
1.141m - 0.019m |
|
IMMT2 |
1m x 1m x h 0.947m (temporary) |
IFI chamber |
1.141m - 0.019m |
purchased(2014/10) |
bKAGRA
name |
size and height |
closest chamber |
beam height |
|
ETMX |
1m x 1m x h 0.986m (temporary) |
EXA chamber |
1.200m |
may use bigger table instead |
ETMY |
1m x 1m x h 0.986m (temporary) |
EYA chamber |
1.200m |
may use bigger table instead |
POX |
1m x 1m x h 1.043m (temporary) |
SR3 chamber |
1.257m |
|
POY |
1m x 1m x h 0.936m (temporary) |
PR3 chamber |
1.150m |
|
POP |
1.2 x 2.4m x h 0.970m |
PR2 chamber |
1.184m |
|
POS |
1.2 x 2.4m x h 1.000m |
SR2 chamber |
1.217m |
|
AS |
1.2 x 2.4m x h 1.000m |
SRM chamber |
1.271m |
|
* Beam height written here is from the mortar surface.
* Mortar thickness is about 20mm by design.
* Difference between the beam height from the concrete surface and the height of the optical table should be larger than 7.6 inch (0.19m)
* See JGW-D1402607
* iKAGRA AS table is omitted because we are not using AS port for iKAGRA 3km Michelson