1550
Comment:
|
3219
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
- [[KAGRA/Subgroups/IOO/OutputTables/Optics| Optics for Output Tables]] |
|
Line 3: | Line 6: |
||name ||size and height ||closest chamber ||beam height ||q-param/position/angle of the beams || ||MC front || 1.2 x 2.4m x h 0.940m ||MCF chamber || 1.134m - 0.012m ||IMC REFL:1.5165+16.8465i/1189mm from PSL side edge/87.6034deg|| ||MCT || 1m x 1m x h 0.955m ||MCE chamber || 1.149m - 0.027m ||IMC TRANS:27.9850+16.8465i/465mm from PSL side edge/88.6689deg|| ||REFL || 1.2 x 2.4m x h 0.947m ||IFI chamber || 1.141m - 0.019m || || ||IMMT2 || 1m x 1m x h 0.947m (temporary) ||IFI chamber || 1.141m - 0.019m || || ||SR2 || 1m x 1m x h 1.000m (temporary for iKAGRA AS) ||SR2 chamber || 1.217m || || ||ETMX || 1m x 1m x h 0.986m (temporary) ||EXA chamber || 1.200m || || ||ETMY || 1m x 1m x h 0.986m (temporary) ||EYA chamber || 1.200m || || |
||name ||size and height ||closest chamber ||beam height ||optical layout drawing / status || ||IMC REFL ||1m x 1m x h 0.940m (CL-1010TS) ||MCF chamber ||1.134m - 0.012m ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3412|JGW-D1503412]] / to be used for POY (or POX) for bKAGRA, purchased(2015/9), installed || ||MCT ||1m x 1m x h 0.955m ||MCE chamber ||1.149m - 0.027m ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3412|JGW-D1503412]] / purchased(2014/10), installed || ||REFL ||1m x 1m x h 0.947m (CL-1010TS) ||IFI chamber ||1.141m - 0.019m ||to be used for POX (or POY) for bKAGRA, purchased(2015/9), returned from VIS (2016/2) || ||IMMT1T ||300mm x 400mm + extension(250mm x 300mm) (breadboard on pylon) ||MMT chamber ||??? ||installed([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=862|klog #862]]) || |
Line 15: | Line 15: |
||POX || 1m x 1m x h 1.043m (temporary) || SR3 chamber || 1.257m || || ||POY || 1m x 1m x h 0.936m (temporary) || PR3 chamber || 1.150m || || ||POP || 1.2 x 2.4m x h 0.970m || PR2 chamber || 1.184m || || ||POS || 1.2 x 2.4m x h 1.000m || SR2 chamber || 1.217m || || ||AS || 1.2 x 2.4m x h 1.000m || SRM chamber || 1.271m || || |
||IMC REFL ||1.2m x 2.4m x h 0.940m ||MCF chamber -Y ||1.134m - 0.012m ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3412|JGW-D1503412]] / used for IMC REFL (2016/11),purchased(2014/10) || ||REFL ||1.2m x 2.4m x h 0.947m ||IFI chamber -Y ||1.141m - 0.019m ||installed(2017/2); was used at Kashiwa ; purchased(2015/9) || ||IMMT2 ||1m x 1m x h 0.947m (CL-1010TS) ||IFI chamber +Y ||1.141m - 0.019m ||VIS is borrowing now, purchased(2014/10) || ||ETMX ||1.2m x 2.0m x h 1.006m ||EXT chamber +X (table is put on mortar surface) ||1.200m ||brought to Xend(2017/2/23);size confirmed(2016/7/11) || ||ETMY ||1.2m x 2.0m x h 1.006m ||EYT chamber +Y (table is put on mortar surface) ||1.200m ||brought to Yend(2017/2/24);size confirmed(2016/7/11) || ||POX ||1m x 1m x h 1.043m (CL-1010TS) ||SR3 chamber -X (-X side is more spacious) ||1.257m ||will be used for AS for bKAGRAp1, used for REFL in iKAGRA, purchased(2015/9) || ||POY ||1m x 1m x h 0.936m (CL-1010TS) ||PR3 chamber +Y ||1.150m ||used for IMC REFL in iKAGRA->now used as workbench for IMMT work, purchased(2015/9) ; anchor holes are at -Y side, but anchors are not needed and it should be at +Y for VIS work(2017/4/14)|| ||POP ||1.2m x 2.4m x h 0.9645m ||PR2 chamber -Y ||1.204m from concrete floor ||now at outside of MCF clean booth;reuse iKAGRA PSL table instead of buying a new one || ||POS ||1.2m x 2.4m x h 1.018m ||SR2 chamber -X ||1.212m from concrete floor ||now at OMMT chamber;height confirmed(2016/11/14) || ||AS ||1.2m x 2.4m x h 1.078m ||OMC chamber +X (table is put on mortar surface) ||1.272m ||installed(2017/3/23);height confirmed(2016/11/14) || |
Line 21: | Line 26: |
* Beam height written here is from the mortar surface. | * Beam height written here is from the mortar surface unless otherwise noted. |
Line 25: | Line 31: |
* Difference between the beam height from the concrete surface and the height of the optical table should be larger than 7.6 inch (0.19m) | * Difference between the beam height from the floor (concrete surface or mortar surface) and the height of the optical table should be larger than 7.6 inch (0.19m) |
Line 28: | Line 34: |
* iKAGRA AS table is omitted because we are not using AS port for iKAGRA 3km Michelson |
KAGRA Output Optical Tables
iKAGRA
name |
size and height |
closest chamber |
beam height |
optical layout drawing / status |
IMC REFL |
1m x 1m x h 0.940m (CL-1010TS) |
MCF chamber |
1.134m - 0.012m |
JGW-D1503412 / to be used for POY (or POX) for bKAGRA, purchased(2015/9), installed |
MCT |
1m x 1m x h 0.955m |
MCE chamber |
1.149m - 0.027m |
JGW-D1503412 / purchased(2014/10), installed |
REFL |
1m x 1m x h 0.947m (CL-1010TS) |
IFI chamber |
1.141m - 0.019m |
to be used for POX (or POY) for bKAGRA, purchased(2015/9), returned from VIS (2016/2) |
IMMT1T |
300mm x 400mm + extension(250mm x 300mm) (breadboard on pylon) |
MMT chamber |
??? |
installed(klog #862) |
bKAGRA
name |
size and height |
closest chamber |
beam height |
|
IMC REFL |
1.2m x 2.4m x h 0.940m |
MCF chamber -Y |
1.134m - 0.012m |
JGW-D1503412 / used for IMC REFL (2016/11),purchased(2014/10) |
REFL |
1.2m x 2.4m x h 0.947m |
IFI chamber -Y |
1.141m - 0.019m |
installed(2017/2); was used at Kashiwa ; purchased(2015/9) |
IMMT2 |
1m x 1m x h 0.947m (CL-1010TS) |
IFI chamber +Y |
1.141m - 0.019m |
VIS is borrowing now, purchased(2014/10) |
ETMX |
1.2m x 2.0m x h 1.006m |
EXT chamber +X (table is put on mortar surface) |
1.200m |
brought to Xend(2017/2/23);size confirmed(2016/7/11) |
ETMY |
1.2m x 2.0m x h 1.006m |
EYT chamber +Y (table is put on mortar surface) |
1.200m |
brought to Yend(2017/2/24);size confirmed(2016/7/11) |
POX |
1m x 1m x h 1.043m (CL-1010TS) |
SR3 chamber -X (-X side is more spacious) |
1.257m |
will be used for AS for bKAGRAp1, used for REFL in iKAGRA, purchased(2015/9) |
POY |
1m x 1m x h 0.936m (CL-1010TS) |
PR3 chamber +Y |
1.150m |
used for IMC REFL in iKAGRA->now used as workbench for IMMT work, purchased(2015/9) ; anchor holes are at -Y side, but anchors are not needed and it should be at +Y for VIS work(2017/4/14) |
POP |
1.2m x 2.4m x h 0.9645m |
PR2 chamber -Y |
1.204m from concrete floor |
now at outside of MCF clean booth;reuse iKAGRA PSL table instead of buying a new one |
POS |
1.2m x 2.4m x h 1.018m |
SR2 chamber -X |
1.212m from concrete floor |
now at OMMT chamber;height confirmed(2016/11/14) |
AS |
1.2m x 2.4m x h 1.078m |
OMC chamber +X (table is put on mortar surface) |
1.272m |
installed(2017/3/23);height confirmed(2016/11/14) |
* Beam height written here is from the mortar surface unless otherwise noted.
* Mortar thickness is about 20mm by design.
* Difference between the beam height from the floor (concrete surface or mortar surface) and the height of the optical table should be larger than 7.6 inch (0.19m)
* See JGW-D1402607
* iKAGRA AS table is omitted because we are not using AS port for iKAGRA 3km Michelson