1966
Comment:
|
1967
|
Deletions are marked like this. | Additions are marked like this. |
Line 14: | Line 14: |
||POX || 1m x 1m x h 1.043m (temporary) || SR3 chamber || 1.257m ||used for REFL in iKAGRA purchased(2015/9)|| | ||POX || 1m x 1m x h 1.043m (temporary) || SR3 chamber || 1.257m ||used for REFL in iKAGRA, purchased(2015/9)|| |
KAGRA Output Optical Tables
iKAGRA
name |
size and height |
closest chamber |
beam height |
optical layout drawing / status |
MC front |
1.2 x 2.4m x h 0.940m |
MCF chamber |
1.134m - 0.012m |
JGW-D1503412 / purchased(2014/10) |
MCT |
1m x 1m x h 0.955m |
MCE chamber |
1.149m - 0.027m |
JGW-D1503412 / purchased(2014/10) |
REFL |
1m x 1m x h 0.947m (temporary) |
IFI chamber |
1.141m - 0.019m |
to be used for POX (or POY) for bKAGRA, purchased(2015/9) |
IMMT2 |
1m x 1m x h 0.947m (temporary) |
IFI chamber |
1.141m - 0.019m |
purchased(2014/10) |
bKAGRA
name |
size and height |
closest chamber |
beam height |
|
REFL |
1.2 x 2.4m x h 0.947m |
IFI chamber |
1.141m - 0.019m |
used at Kashiwa for now, purchased(2015/9) |
ETMX |
1m x 1m x h 0.986m (temporary) |
EXA chamber |
1.200m |
may use bigger table instead |
ETMY |
1m x 1m x h 0.986m (temporary) |
EYA chamber |
1.200m |
may use bigger table instead |
POX |
1m x 1m x h 1.043m (temporary) |
SR3 chamber |
1.257m |
used for REFL in iKAGRA, purchased(2015/9) |
POY |
1m x 1m x h 0.936m (temporary) |
PR3 chamber |
1.150m |
purchased(2015/9) |
POP |
1.2 x 2.4m x h 0.970m |
PR2 chamber |
1.184m |
|
POS |
1.2 x 2.4m x h 1.000m |
SR2 chamber |
1.217m |
|
AS |
1.2 x 2.4m x h 1.000m |
SRM chamber |
1.271m |
|
* Beam height written here is from the mortar surface.
* Mortar thickness is about 20mm by design.
* Difference between the beam height from the concrete surface and the height of the optical table should be larger than 7.6 inch (0.19m)
* See JGW-D1402607
* iKAGRA AS table is omitted because we are not using AS port for iKAGRA 3km Michelson