Differences between revisions 36 and 37
Revision 36 as of 2016-01-12 10:28:23
Size: 1967
Comment:
Revision 37 as of 2016-01-13 16:19:50
Size: 2274
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
||MC front || 1.2 x 2.4m x h 0.940m ||MCF chamber || 1.134m - 0.012m ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3412|JGW-D1503412]] / purchased(2014/10)|| ||IMC REFL|| 1m x 1m x h 0.940m (CL-1010TS) ||MCF chamber || 1.134m - 0.012m ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3412|JGW-D1503412]] / to be used for POY (or POX) for bKAGRA purchased(2015/9)||
Line 6: Line 6:
||REFL || 1m x 1m x h 0.947m (temporary) ||IFI chamber || 1.141m - 0.019m ||to be used for POX (or POY) for bKAGRA, purchased(2015/9) ||
||IMMT2 || 1m x 1m x h 0.947m (temporary) ||IFI chamber || 1.141m - 0.019m ||purchased(2014/10) ||
||REFL || 1m x 1m x h 0.947m (CL-1010TS) ||IFI chamber || 1.141m - 0.019m ||VIS is borrowing now, to be used for POX (or POY) for bKAGRA, purchased(2015/9) ||
Line 11: Line 10:
||IMMT2 || 1m x 1m x h 0.947m (CL-1010TS) ||IFI chamber || 1.141m - 0.019m ||VIS is borrowing now, purchased(2014/10)||
||IMC REFL|| 1.2 x 2.4m x h 0.940m ||MCF chamber || 1.134m - 0.012m ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3412|JGW-D1503412]] / purchased(2014/10)||
Line 12: Line 13:
||ETMX || 1m x 1m x h 0.986m (temporary) ||EXA chamber || 1.200m || may use bigger table instead||
||ETMY || 1m x 1m x h 0.986m (temporary) ||EYA chamber || 1.200m || may use bigger table instead||
||POX || 1m x 1m x h 1.043m (temporary) || SR3 chamber || 1.257m ||used for REFL in iKAGRA, purchased(2015/9)||
||POY || 1m x 1m x h 0.936m (temporary) || PR3 chamber || 1.150m ||purchased(2015/9)||
||ETMX || 1m x 1m x h 0.986m (CL-1010TS) ||EXA chamber || 1.200m || may use bigger table instead||
||ETMY || 1m x 1m x h 0.986m (CL-1010TS) ||EYA chamber || 1.200m || may use bigger table instead||
||POX || 1m x 1m x h 1.043m (CL-1010TS) || SR3 chamber || 1.257m ||used for REFL in iKAGRA, purchased(2015/9)||
||POY || 1m x 1m x h 0.936m (CL-1010TS) || PR3 chamber || 1.150m ||used for IMC REFL in iKAGRA, purchased(2015/9)||

KAGRA Output Optical Tables

iKAGRA

name

size and height

closest chamber

beam height

optical layout drawing / status

IMC REFL

1m x 1m x h 0.940m (CL-1010TS)

MCF chamber

1.134m - 0.012m

JGW-D1503412 / to be used for POY (or POX) for bKAGRA purchased(2015/9)

MCT

1m x 1m x h 0.955m

MCE chamber

1.149m - 0.027m

JGW-D1503412 / purchased(2014/10)

REFL

1m x 1m x h 0.947m (CL-1010TS)

IFI chamber

1.141m - 0.019m

VIS is borrowing now, to be used for POX (or POY) for bKAGRA, purchased(2015/9)

bKAGRA

name

size and height

closest chamber

beam height

IMMT2

1m x 1m x h 0.947m (CL-1010TS)

IFI chamber

1.141m - 0.019m

VIS is borrowing now, purchased(2014/10)

IMC REFL

1.2 x 2.4m x h 0.940m

MCF chamber

1.134m - 0.012m

JGW-D1503412 / purchased(2014/10)

REFL

1.2 x 2.4m x h 0.947m

IFI chamber

1.141m - 0.019m

used at Kashiwa for now, purchased(2015/9)

ETMX

1m x 1m x h 0.986m (CL-1010TS)

EXA chamber

1.200m

may use bigger table instead

ETMY

1m x 1m x h 0.986m (CL-1010TS)

EYA chamber

1.200m

may use bigger table instead

POX

1m x 1m x h 1.043m (CL-1010TS)

SR3 chamber

1.257m

used for REFL in iKAGRA, purchased(2015/9)

POY

1m x 1m x h 0.936m (CL-1010TS)

PR3 chamber

1.150m

used for IMC REFL in iKAGRA, purchased(2015/9)

POP

1.2 x 2.4m x h 0.970m

PR2 chamber

1.184m

POS

1.2 x 2.4m x h 1.000m

SR2 chamber

1.217m

AS

1.2 x 2.4m x h 1.000m

SRM chamber

1.271m

* Beam height written here is from the mortar surface.

* Mortar thickness is about 20mm by design.

* Difference between the beam height from the concrete surface and the height of the optical table should be larger than 7.6 inch (0.19m)

* See JGW-D1402607

* iKAGRA AS table is omitted because we are not using AS port for iKAGRA 3km Michelson

KAGRA/Subgroups/IOO/OutputTables (last edited 2022-05-11 06:27:47 by ChenDan)