793
Comment:
|
1430
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
MC front: 1.2 x 2.4m (close to MCF chamber; beam height=) |
||name ||size and height ||closest chamber ||beam height ||q-params/position/angle of the beams || ||MC front || 1.2 x 2.4m x h 0.940m ||MCF chamber || 1.134m - 0.012m || || ||MCT || 1m x 1m x h 0.955m ||MCE chamber || 1.149m - 0.027m || || ||REFL || 1.2 x 2.4m x h 0.947m ||IFI chamber || 1.141m - 0.019m || || ||IMMT2 || 1m x 1m x h 0.947m (temporary) ||IFI chamber || 1.141m - 0.019m || || ||SR2 || 1m x 1m x h 1.000m (temporary for iKAGRA AS) ||SR2 chamber || 1.217m || || ||ETMX || 1m x 1m x h 0.986m (temporary) ||EXA chamber || 1.200m || || ||ETMY || 1m x 1m x h 0.986m (temporary) ||EYA chamber || 1.200m || || |
Line 6: | Line 12: |
MCT: 1m x 1m (close to MCE chamber; beam height=) REFL: 1.2 x 2.4m (close to IFI chamber; beam height=) POX: 1m x 1m (close to ??? chamber; beam height=) IMMT2: 1m x 1m (temporary) (close to IFI chamber; beam height=) SR2: 1m x 1m (temporary for iKAGRA AS) (close to SR2 chamber; beam height=) ETMX: 1m x 1m (temporary) (close to EXC chamber; beam height=) ETMY: 1m x 1m (temporary) (close to EYC chamber; beam height=) |
|
Line 28: | Line 14: |
POY: 1m x 1m (close to ??? chamber; beam height=) |
||name ||size and height ||closest chamber ||beam height || || ||POX || 1m x 1m x h 1.043m (temporary) || SR3 chamber || 1.257m || || ||POY || 1m x 1m x h 0.936m (temporary) || PR3 chamber || 1.150m || || ||POP || 1.2 x 2.4m x h 0.970m || PR2 chamber || 1.184m || || ||POS || 1.2 x 2.4m x h 1.000m || SR2 chamber || 1.217m || || ||AS || 1.2 x 2.4m x h 1.000m || SRM chamber || 1.271m || || |
Line 31: | Line 21: |
POP: 1.2 x 2.4m (close to PR3 chamber; beam height=) |
* Beam height written here is from the mortar surface. |
Line 34: | Line 23: |
POS: 1.2 x 2.4m (close to ??? chamber; beam height=) |
* Mortar thickness is about 20mm by design. |
Line 37: | Line 25: |
AS: 1.2 x 2.4m (close to SRM chamber; beam height=) |
* Difference between the beam height from the concrete surface and the height of the optical table should be larger than 7.6 inch (0.19m) * See [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2607|JGW-D1402607]] |
KAGRA Output Optical Tables
iKAGRA
name |
size and height |
closest chamber |
beam height |
q-params/position/angle of the beams |
MC front |
1.2 x 2.4m x h 0.940m |
MCF chamber |
1.134m - 0.012m |
|
MCT |
1m x 1m x h 0.955m |
MCE chamber |
1.149m - 0.027m |
|
REFL |
1.2 x 2.4m x h 0.947m |
IFI chamber |
1.141m - 0.019m |
|
IMMT2 |
1m x 1m x h 0.947m (temporary) |
IFI chamber |
1.141m - 0.019m |
|
SR2 |
1m x 1m x h 1.000m (temporary for iKAGRA AS) |
SR2 chamber |
1.217m |
|
ETMX |
1m x 1m x h 0.986m (temporary) |
EXA chamber |
1.200m |
|
ETMY |
1m x 1m x h 0.986m (temporary) |
EYA chamber |
1.200m |
|
bKAGRA
name |
size and height |
closest chamber |
beam height |
|
POX |
1m x 1m x h 1.043m (temporary) |
SR3 chamber |
1.257m |
|
POY |
1m x 1m x h 0.936m (temporary) |
PR3 chamber |
1.150m |
|
POP |
1.2 x 2.4m x h 0.970m |
PR2 chamber |
1.184m |
|
POS |
1.2 x 2.4m x h 1.000m |
SR2 chamber |
1.217m |
|
AS |
1.2 x 2.4m x h 1.000m |
SRM chamber |
1.271m |
|
* Beam height written here is from the mortar surface.
* Mortar thickness is about 20mm by design.
* Difference between the beam height from the concrete surface and the height of the optical table should be larger than 7.6 inch (0.19m)
* See JGW-D1402607