Line 3: Line 3:
MC front: 1.2 x 2.4m
(close to MCF chamber; beam height=1.134m)
||name ||size and height ||closest chamber ||beam height ||q-param/position/angle of the beams ||
||MC front || 1.2 x 2.4m x h 0.940m ||MCF chamber || 1.134m - 0.012m ||IMC REFL: ||
||MCT || 1m x 1m x h 0.955m ||MCE chamber || 1.149m - 0.027m || ||
||REFL || 1.2 x 2.4m x h 0.947m ||IFI chamber || 1.141m - 0.019m || ||
||IMMT2 || 1m x 1m x h 0.947m (temporary) ||IFI chamber || 1.141m - 0.019m || ||
||SR2 || 1m x 1m x h 1.000m (temporary for iKAGRA AS) ||SR2 chamber || 1.217m || ||
||ETMX || 1m x 1m x h 0.986m (temporary) ||EXA chamber || 1.200m || ||
||ETMY || 1m x 1m x h 0.986m (temporary) ||EYA chamber || 1.200m || ||
Line 6: Line 12:
MCT: 1m x 1m
(close to MCE chamber; beam height=1.149m)

REFL: 1.2 x 2.4m
(close to IFI chamber; beam height=1.141m)

POX: 1m x 1m
(close to SR3 chamber; beam height=)

IMMT2: 1m x 1m (temporary)
(close to IFI chamber; beam height=1.141m)

SR2: 1m x 1m (temporary for iKAGRA AS)
(close to SR2 chamber; beam height=)

ETMX: 1m x 1m (temporary)
(close to EXC chamber; beam height=)

ETMY: 1m x 1m (temporary)
(close to EYC chamber; beam height=)
Line 28: Line 14:
POY: 1m x 1m
(close to PR3 chamber; beam height=)
||name ||size and height ||closest chamber ||beam height || ||
||POX || 1m x 1m x h 1.043m (temporary) || SR3 chamber || 1.257m || ||
||POY || 1m x 1m x h 0.936m (temporary) || PR3 chamber || 1.150m || ||
||POP || 1.2 x 2.4m x h 0.970m || PR2 chamber || 1.184m || ||
||POS || 1.2 x 2.4m x h 1.000m || SR2 chamber || 1.217m || ||
||AS || 1.2 x 2.4m x h 1.000m || SRM chamber || 1.271m || ||
Line 31: Line 21:
POP: 1.2 x 2.4m
(close to PR2 chamber; beam height=)
* Beam height written here is from the mortar surface.
Line 34: Line 23:
POS: 1.2 x 2.4m
(close to ??? chamber; beam height=)
* Mortar thickness is about 20mm by design.
Line 37: Line 25:
AS: 1.2 x 2.4m
(close to SRM chamber; beam height=)
* Difference between the beam height from the concrete surface and the height of the optical table should be larger than 7.6 inch (0.19m)

* See [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2607|JGW-D1402607]]

KAGRA Output Optical Tables

iKAGRA

name

size and height

closest chamber

beam height

q-param/position/angle of the beams

MC front

1.2 x 2.4m x h 0.940m

MCF chamber

1.134m - 0.012m

IMC REFL:

MCT

1m x 1m x h 0.955m

MCE chamber

1.149m - 0.027m

REFL

1.2 x 2.4m x h 0.947m

IFI chamber

1.141m - 0.019m

IMMT2

1m x 1m x h 0.947m (temporary)

IFI chamber

1.141m - 0.019m

SR2

1m x 1m x h 1.000m (temporary for iKAGRA AS)

SR2 chamber

1.217m

ETMX

1m x 1m x h 0.986m (temporary)

EXA chamber

1.200m

ETMY

1m x 1m x h 0.986m (temporary)

EYA chamber

1.200m

bKAGRA

name

size and height

closest chamber

beam height

POX

1m x 1m x h 1.043m (temporary)

SR3 chamber

1.257m

POY

1m x 1m x h 0.936m (temporary)

PR3 chamber

1.150m

POP

1.2 x 2.4m x h 0.970m

PR2 chamber

1.184m

POS

1.2 x 2.4m x h 1.000m

SR2 chamber

1.217m

AS

1.2 x 2.4m x h 1.000m

SRM chamber

1.271m

* Beam height written here is from the mortar surface.

* Mortar thickness is about 20mm by design.

* Difference between the beam height from the concrete surface and the height of the optical table should be larger than 7.6 inch (0.19m)