Line 3: Line 3:
|| || LAS 40W || PMC || IMC || MZI || Refcav vac || RAM ||
||4||<#00ffd8> 三尾研テスト || || || || || ||
||5|| ||<#FF00FF>Commissh||<#FF00FF>Lock || |||| ||
||6||<#FF00FF>Install || ||<#FF00FF>MCO check || |||| ||
||7||<#FF00FF>Test || || || |||| ||
||8||<#FF00FF> || || || |||| ||
||9|| || || || |||| ||
||10|| || || || |||| ||
||11|| || || || |||| ||
||12|| || || || |||| ||
||1|| || || || |||| ||
== 打ち合わせ ==
Line 15: Line 5:

== 打ち合わせ 
1/10@神岡 ==

中野、苔山
1/10, 神岡
参加者:中野、苔山
Line 52: Line 40:


|| || LAS 40W || PMC || IMC || MZI || Refcav vac || RAM ||
||4||<#00ffd8> 三尾研テスト || || || || || ||
||5|| ||<#FF00FF>Commissh||<#FF00FF>Lock || |||| ||
||6||<#FF00FF>Install || ||<#FF00FF>MCO check || |||| ||
||7||<#FF00FF>Test || || || |||| ||
||8||<#FF00FF> || || || |||| ||
||9|| || || || |||| ||
||10|| || || || |||| ||
||11|| || || || |||| ||
||12|| || || || |||| ||
||1|| || || || |||| ||

2018

== 打ち合わせ ==

1/10, 神岡 参加者:中野、苔山

1 - 2 月

PMCを置く: 3-4日

  • 目標:PMCの組み立て
  • この時点ではモードマッチ、アライメント、制御は行わない
  • 時間があればケーブリング、回路の設置を行う
    • PZTの接続 (PZT driver(JGW-S1706915)を中に
    • 温調の接続 (コントローラとの接続確認)

4月

  • HPL 三尾研で市販のものを動かしてみる
    • 本郷でテストの後、神岡へ発送

5月

  • PMC所定の位置へインストール
  • モードマッチ、アライメント、制御

=> IMC lock 確認

  • 真空開けてMCO コイルチェック
  • 真空引き

=> IMC lock 確認

6月

  • ハイパワーレーザーインストール

その他

  • MZI
  • RAM monitor => 可能なら2月?

  • ISS => 1st loop は phase-1 で終わりそう

  • IMMTねじ交換 (大石?)

Action Items

  • Refcav, PMC用 EOMが現在ローパワー対応。どうするか考える。

LAS 40W

PMC

IMC

MZI

Refcav vac

RAM

4

三尾研テスト

5

Commissh

Lock

6

Install

MCO check

7

Test

8

9

10

11

12

1