= Meeting = [[attachment:Note_First_Meeting]] == 7/1 2016 Skype Telecon == * KC and JGP will consider closer for the optical configuration (please upload new info) * KK will check if we have all necessary components * KK, KC and JGP will discuss about the disital software in Seoul * SK and KK will meet in Kamioka for a preparation (8/10) * We'll have another skype meeting before the site work == 7/8 2016 in Sogang University == * JGP will prepare the drawing of the configuration (on the pylon optical table) * JGP will prepare the required circuits (signal amps). * For the online data taking and analysis, we will need a digital model and MEDM screens. JGP will prepare the initial concept of the digital software. * With the prepared concept, we will build the model and make MEDM screens during KC/JGP visit (~1day). * We noticed that the digital software cannot do arc tangent. We will consider to use an approximation. * As planned, KK and SK will collect the necessary hardware on 8/10 (DC power supply, 50m cable, cable adaptors, AA filter) * KK will let JGP know about the Dsub 9 pin assignment to connect to an AA filter. == 8/2 2016 Skype Telecon == === Preparation === * JGP will get the drawing in a few days. * All the parts will arrive today. KC and JGP will carry them (no shipping). * JGP will assemble and test the circuits this week. Reports will be made next week. * Model and MEDM screens will be prepared with Kirii-kun on 8/10 as well as the first phase of the visit. * KC will think about the approximation formula of art tangent to use in the digital model. * SJ will submit the "tunnel entrance form" for the experiment. * KK will send the Dsub pin assignment today. * KK will find AA filter soon. === Other note === * No IR laser beam during the experiment. * We have to check again about the safety lecture. === Next meeting === * Next meeting will be 8/5 9:20 am. KK will call everyone on skype. == 8/4 2016 Skype telecon == * The parts arrived; some mechanical parts were found wrong; JGP have fixed them; JGP will assemble today. * The drawing of the optical table (python table) will be done today by JGP. * Test result of the setup will be emailed. * KC made the new algorithm without arc tangent. JGP will check the formulas with real data. KK will check if it can be done in the CDS system or not. * Check the safety rule. * SJ will submit the mine entrance form. * JGP will carry the clumps (which is to fix the sensor on the table). == 10/6 2016 skype telecon == * Target is Physics Letter A. * To check the calibration again with the peak areas and higher harmonics taken into account. * To check the drift data with the calibration factor. * To check if the oplev noise went down or not after we took the tiltsensor out. * For paper, KK and SK will write the intro part, and JGP will write the resulting part. * Email to Kanda-san (KSC) about the open data === paper contents === * we could calibrate oplev using the tilt sensor * They agreed ok * Tiltsensor's dynamic range was much larger than oplevs * environmental perturbation to be improved == 10/20 2016 Local metting (KK & SJ) == * We do not understand the calibration factors (or the spectrum magnitudes) change between tilt sensors and oplevs * We will re-center the MCE oplev on Monday * An excitation peak will be inserted on MCE and see if the peak height change in time * We will have another local meeting on Wednesday morning. == 10/26 2016 skype meeting == * oplev noise floor change of the last measurement is most likely because of the tilt sensor installation * Jungyu will come to KAGRA and we will repeat the measurement * Windshields will be available thanks to Akutsu san in the next measurement * Schedule is not fixed yet == 3/1 2017 skype meeting == * 2nd visit klog list http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/IOO/TiltSensor/Documents2 * How can we proceed with KAGRA open data regulations? * Kawamura-sensei will contact to Kanda-san * Then Kokeyama will ask to KSC board * Paper contents * Comparison between oplev and tiltsensor spectra * present a cal peak to show tiltsensor is properly seeing the mirror motion * dark/ADC noise limit of tiltsensor * How can we estimate the tiltsensor dark or ADC noise limit? * Junegyu and Kyuman will study * Target is Optics Letters * Make a rough draft by Niigata f2f meeting * Next call will be a few days before f2f meeting for the presentation there == 4/13 2017 skype meeting == MinutesMeeting0413 == 6/13 2017 skype meeting == * Junegyu edit the draft by 6/14 evening * Seiji & Keiko will read by the end of this weekend (6/18) * The new design to manufacture was fixed * Seiji found the way to pay by the Japanese company to the Korean company