Differences between revisions 13 and 14
Revision 13 as of 2016-08-15 15:59:21
Size: 1208
Comment:
Revision 14 as of 2017-02-24 10:43:28
Size: 1372
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
=== 1st visit ===
Line 15: Line 16:

=== Second visit ===
|| Feb 13-17 || || SJ (MON, TUE), JGP, KC, SK, KK ||
|| Feb 20-23 || || JGP, KK ||

Plan

Schedule

1st visit

Date

Description

Personnel

Jul 8

Meetin at

KK, CK, JGP

Jul ?

Skype Meeting

all

Aug 10

Preparation day in Kamioka

SK, KK

Aug 15

SJ, JGP, KC, SK, KK

Aug 16

SJ, JGP, KC, SK, KK

Aug 17

SJ, JGP, KC, SK, (KK leaving at 15:30)

Aug 18

KC, SK, KK

Aug 19

JGP, KC, SK, KK

Aug 22

JGP, KC, SK, KK

Aug 23

SJ, JGP, KC, SK, (KK around only afternoon)

Aug 24

SJ, JGP, KC, SK, (KK around only morning)

Second visit

Feb 13-17

SJ (MON, TUE), JGP, KC, SK, KK

Feb 20-23

JGP, KK

To Do List

Sometime Soon

  • Do we need an additional AA board? (If yes, find Scasii cable, too)
  • Do we need an additional whitening board?
  • Do we need and additional BNC-Dsub converter?
  • Does the BNC-Dsub converter appropriated for the AA board?

Jul 8

  • Check the spare channel of ADC
  • Do we need to install an additional ADC card, BNC-Dsub converter board, Whitening Board
  • Install them
  • 50m BNC cables x 4
  • 1m/1.5m Dsub 15pin cable x 4

KAGRA/Subgroups/IOO/TiltSensor/Schedule (last edited 2017-02-24 10:43:28 by KeikoKokeyama)