Differences between revisions 2 and 3
Revision 2 as of 2016-07-01 16:44:51
Size: 636
Comment:
Revision 3 as of 2016-07-01 16:50:40
Size: 1133
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
== 2016 == == Schedule ==
Line 15: Line 15:

== To Do List ==

=== Sometime Soon ===
 * Do we need an additional AA board? (If yes, find Scasii cable)
 * Do we need an additional whitening board?
 * Do we need and additional BNC-Dsub converter?
 * Does the BNC-Dsub converter appropriated for the AA board?

=== Jul 8 ===
 * Check the spare channel of ADC
 * Do we need to install an additional ADC card, BNC-Dsub converter board, Whitening Board
 * Install them
 * 50m BNC cables x 4
 * 1m/1.5m Dsub 15pin cable x 4
 

Plan

Schedule

Date

Description

Personnel

Jul 8

Meetin at

KK, CK, JGP

Jul ?

Skype Meeting

all

Aug 10

Preparation day in Kamioka

SJ, KK

Aug 15

SJ?, JGP, KC, SK, KK

Aug 16

SJ, JGP, KC,SK, KK

Aug 17

SJ?, JGP, KC,SK, KK

Aug 18

KC, SK, KK

Aug 19

JGP, KC, SK, KK

Aug 22

JGP, KC, SK, KK

Aug 23

JGP, KC, SK, KK

Aug 24

JGP, KC, SK, KK

To Do List

Sometime Soon

  • Do we need an additional AA board? (If yes, find Scasii cable)
  • Do we need an additional whitening board?
  • Do we need and additional BNC-Dsub converter?
  • Does the BNC-Dsub converter appropriated for the AA board?

Jul 8

  • Check the spare channel of ADC
  • Do we need to install an additional ADC card, BNC-Dsub converter board, Whitening Board
  • Install them
  • 50m BNC cables x 4
  • 1m/1.5m Dsub 15pin cable x 4

KAGRA/Subgroups/IOO/TiltSensor/Schedule (last edited 2017-02-24 10:43:28 by KeikoKokeyama)