8394
Comment:
|
16217
|
Deletions are marked like this. | Additions are marked like this. |
Line 162: | Line 162: |
=== 7/10-7/24 === | === 7/10-7/14 === |
Line 166: | Line 166: |
* Air effects on FSS http://klog.icrr.u-tokyo.ac.jp/osl/?r=3097 | |
Line 171: | Line 172: |
* IMC-WFS preparation [[../MC/IMCWFS|IMCASC]] | |
Line 175: | Line 177: |
* PSL 光分ける * Beam Profile http://klog.icrr.u-tokyo.ac.jp/osl/?r=3117 * Beam Profile corrected http://klog.icrr.u-tokyo.ac.jp/osl/?r=3122 * Alignment almost done http://klog.icrr.u-tokyo.ac.jp/osl/?r=3124 * Bypass finished! http://klog.icrr.u-tokyo.ac.jp/osl/?r=3136 * WFS tuning * Cannot be tuned http://klog.icrr.u-tokyo.ac.jp/osl/?r=3106 * Tuned and returned http://klog.icrr.u-tokyo.ac.jp/osl/?r=3130 * MC_REFL (both LSC and ASC) height changed to 4 inch http://klog.icrr.u-tokyo.ac.jp/osl/?r=3135 |
|
Line 180: | Line 191: |
* IMMT1 mirror moved to chamber, not suspended yet http://klog.icrr.u-tokyo.ac.jp/osl/?r=3119 * IMMT2 suspension taken out http://klog.icrr.u-tokyo.ac.jp/osl/?r=3134 * 7/21・阿久津・苔山 IMMT1 viewports & pylon インストール * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3138 * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3139 * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3140 |
|
Line 182: | Line 199: |
* 中野・長野(k) * 大石・苔山・IMMT integration (no oplev) |
* 中野・長野(k)・長野(s) * PSL 光分ける * Bypass path is not aligned http://klog.icrr.u-tokyo.ac.jp/osl/?r=3157 * Bypass path alined http://klog.icrr.u-tokyo.ac.jp/osl/?r=3178 * --( WFS tuning )-- Done * IMC-WFS measurement * WFS path profile http://klog.icrr.u-tokyo.ac.jp/osl/?r=3141 * WFS re-installed http://klog.icrr.u-tokyo.ac.jp/osl/?r=3156 * 7/25-26 IMC リークテスト * Summary https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6991 * 大石・IMMT1 mirror suspended * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3177 * IMMT1 viewport 取り替え * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3151 |
Line 187: | Line 216: |
* 中野・長野(k)・長野(s)・苔山 * IMMT1 oplev/ISS 定盤搬入? |
* 中野・長野(k)・長野(s)・苔山・野替 (8/2-3) * 月〜火 IMMT2 インスタレーション * IMMT1 transfer function * Strange TF http://klog.icrr.u-tokyo.ac.jp/osl/?r=3182 * Coil driver changed and TF OK http://klog.icrr.u-tokyo.ac.jp/osl/?r=3210 * IMMT2 suspended (outside) http://klog.icrr.u-tokyo.ac.jp/osl/?r=3187 * IMMT2 installed, TF OK http://klog.icrr.u-tokyo.ac.jp/osl/?r=3194 * IMMT1, 2 first contacts removed http://klog.icrr.u-tokyo.ac.jp/osl/?r=3213 * 水 IFI に光を通す確認 * IMM-PRM duct removed http://klog.icrr.u-tokyo.ac.jp/osl/?r=3203 * 水〜金 IMC ASC * WFS signals were seen http://klog.icrr.u-tokyo.ac.jp/osl/?r=3218 * PSL * FSS's LO was lost http://klog.icrr.u-tokyo.ac.jp/osl/?r=3207 * Function generator replaced http://klog.icrr.u-tokyo.ac.jp/osl/?r=3215 * IMC lockloss due to air conditioning? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3214 * --(IFIブロックのときに使ったのはSTM2のみだったか?(見て確認))-- * エアガンをつけかえる準備 (Not Done!) * --(アルミ箔を調達)-- * PR2-3 2mW が出ることのアナウンス |
Line 191: | Line 238: |
* 中野・長野(s)・苔山 * 道村・ビームプロファイル, IMMT位置調整 |
* 苔山 * 川村先生北京で不在 * laser pwr 2mW * 8/8 IMMT1 TRANS ブレッドボード納品 (神岡) * 8/10 IMMT1 TRANS ブレッドボードインストール (古畑・苔山) ==== 道村・新潟大(菅井・中村・平田 (8/8-9))・武田・ビームプロファイルとIMMT位置調整 ==== ===== Notes ===== * PR2-3間にウエストがあるので、そこまで測る(アルミの台使う) * 週後半PRMサイドでPRMのくみたて始まるので注意 * PRMはないので beam profile は計算上混みでよくなるようにする * IMMT1-2の距離調整おこなう * 今回はPR2-3 距離の調整は行わない * テフロンシートありでやる * 光軸の高さは --(IMMT1で220mm)-- Done、IMMT2で210mmであることを確認する * IMMT2透過光光学系を確認する ===== Daily ToDo ===== * Monday * --(IMM-PRMの間をアルミでつなぐ)-- Done * Tuesday * --(台を使わせてもらう (near PR2, AOS tool rack の横の))--、使い終わったらクリーンブース内に入れておくかカバーをかぶせて外に * --(windows 入りの macbook を用意。Software用意。)-- * --(ベローズをどけてコーチがPR3へ行き来できるようにする)-- * --(IMMT2の土台をずらす(大石さん))-- * --(PRM の空気入れフランジをとりつける。(鈴木さん) )-- * Wednesday * --(PRM の +X, +Y フランジ蓋をとりはずし、アルミでふさぐ。光を通す穴を開ける。)-- * Thursday * beam profiler soft 設定間違っていたので測定し直した ==== Logs ==== * IMMT1,2 alignment etc http://klog.icrr.u-tokyo.ac.jp/osl/?r=3235 * Measurement 1 http://klog.icrr.u-tokyo.ac.jp/osl/?r=3240 * Measurement 2 (Success!) http://klog.icrr.u-tokyo.ac.jp/osl/?r=3245 ==== Preparation for Next week ==== * oplev x 2 (Thanks to Simon & Akutsu-san) * Damp for IMMT1 (recycle the one already in IMMT1) * oplev反射鏡 x 1 (holder, pedestal are ready, mirror is missing) * IMMT2 透過ステアリングのミラー x 2 (recycle iKAGRA-IMMT1&2 - pedestals and mounts are ready) * --(IMMT2のifoからの戻り光のDamper)-- === 8/11 - 8/15 === ''' Obon Brake KAGRA Closed ''' |
Line 195: | Line 285: |
* 寺田, 新潟大・IMMT oplev & beam dumper installation |
* 苔山・有富 * 野替・中村・平田・Chen 8/17-18? * laser pwr 500mW * 寺田, 新潟大・IMMT oplev & beam damp installation * Items to be installed * oplev x 2 * Damp for IMMT1 * oplev反射鏡 x 1 (IMMT2のうしろ) * IMMT2 透過ステアリングのミラー x 2 (IMMT2のうしろ) * --(IMMT2のifoからの戻り光のDamper)-- * MC power 40mW http://klog.icrr.u-tokyo.ac.jp/osl/?r=3253 * IMMT1, 2 oplev light and QPD installation http://klog.icrr.u-tokyo.ac.jp/osl/?r=3257 * Installation log http://klog.icrr.u-tokyo.ac.jp/osl/?r=3257 * Beam damp入れてない * iKAGRAで使用したIMMT1, 2 のミラーはPSL前室のデシケーターに入れた * IMMT2のoplevのフォールディングミラーにはiKAGRAのIMMT1のトランスに使用したステアリングミラーを使用した * IMMT2からメイン干渉計に行くビームがyawの+方向に大きくずれているが、IMMT2の調整は行わなかった * はさみ半分IFIタンクの底に落としました (2017.8.18 寺田) |
Line 199: | Line 306: |
* 苔山・IMMT integration w/ oplevs | * 苔山・有富 * 8/21 No site work (拡大チーフ会議) * 8/21 - IMC ASC * MCO has bad coil balance http://klog.icrr.u-tokyo.ac.jp/osl/?r=3295 * No valid signals seen http://klog.icrr.u-tokyo.ac.jp/osl/?r=3302 * --( Phase-1 ISS の M24, AOM インストール (古畑・酒本) )-- 9/4以降に延期 |
Line 202: | Line 314: |
* ビームをBSに送る * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2017August|F2F meeting at Toyama U]] |
* 苔山 * 8/28 ミスミ納品 * [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0035/D1503562/002/Oplev_QPDiam.pdf|DCQPD]] will be delivered * 8/29 IMMT1, 2 の EQ stop をリリースする(大石) * 8/28-30 [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2017August|F2F meeting at Toyama U]] * 8/31 IMMT1, 2 のコイルバランスをラフに確認する (苔山) * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3312 * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3315 |
Line 206: | Line 324: |
* IMC-WFS * ISS 1st loop, (富山大) == table layout == * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6335|table layout]] |
=== 9/4-8 === * 9/4 IMMT1,2 oplev 再調整 (阿久津, 苔山) * 9/4? IMC-ASC (道村, 苔山) * 9/6-8 ISS (古畑・酒本) * IFI横のゴーストビームをダンプする (ダンプがP偏光用のはず by 阿久津) === 9/11-15 === * ISS (古畑・酒本) * IMC-WFS (苔山, 野替) * --(9/14 に BS installation 完了予定)-- Delayed * --(9/22 BS cabling 終了予定)-- Delayed, Commissioning starts on 10/2 * 9/19 に PRM installation 完了予定 * BS が入り Yend までビームを飛ばす時に IMMT1,2 の位置を確定、テフロンシートをとり敷板を入れる (大石) * Yend での Beam profile (MIF?) === 9/19-22 === * 苔山不在 (KEK meeting & 京都大) * ISS? === 9/25-29 === * ISS * 9/26 午後 ビームシャッターインストール (宗宮) === Later === * ETMY 10月 * ビームを BS に送る * X end まで光を送りたい * その後メイン干渉計がOKか確認して IMM-PRM ダクト締結 * PR3-PR2 ダクトは Y end の real suspension インストール終了次第 (かつPR系全部入ったら?)閉じる * ISS 1st loop * Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月) |
Schedule
Contents
4月
4/10-14
- Mon-Tue: 中野・苔山
- Wed-Fri: 苔山・榎本
- 物品確認
4/17-4/21
- 苔山・中野・榎本
- Fri:川村
4/24-4/28
- 作業なし
クーラーがついた (http://klog.icrr.u-tokyo.ac.jp/osl/?r=2722)
5月
5/1-5/2
- なし
5/8-5/12
- GWADW
5/15-5/19
- 苔山・中野・榎本・粕谷
RefCav へのモードマッチ
- 大石・IMMT治具の設計
5/22-5/26
- 苔山・中野・榎本・粕谷
- Thu-Fri 山本(晃)
- Refcav Installation, Alignment
5/23 13:00 PSL Design and Purchase phone call
- 大石・IMMT治具の設計
Refcav Flash! http://klog.icrr.u-tokyo.ac.jp/osl/?r=2781
Bad mode matching http://klog.icrr.u-tokyo.ac.jp/osl/?r=2791
Strange interference http://klog.icrr.u-tokyo.ac.jp/osl/?r=2794
RFPD Broken http://klog.icrr.u-tokyo.ac.jp/osl/?r=2796 (former IMC RFPD, now FSS RFPD, 51 MHZ)
Refcav locked! http://klog.icrr.u-tokyo.ac.jp/osl/?r=2810
Condensation... http://klog.icrr.u-tokyo.ac.jp/osl/?r=2815
5/29-6/2
- 苔山・中野・長野(s)・山本(k)
- Refcavの性能評価、デジタル接続、リモート化、自動化
- IMCのリーク箇所の改修作業 (5/29-31)
- 大石・IMMT治具の設計
- 廣瀬・6/2までに鏡のPET-Gコンテナ2個とペリカンケースを柏から神岡に送る
OLG & cavity pole http://klog.icrr.u-tokyo.ac.jp/osl/?r=2837
Measurement of [mV/MHz] http://klog.icrr.u-tokyo.ac.jp/osl/?r=2842 Agreed with Nakano-kun's another measurement Calibration may not have been correct
Changing PSL room temperature http://klog.icrr.u-tokyo.ac.jp/osl/?r=2845
6月
6/5-6/9
- 苔山・中野・長野(s)・山本(k)
- 大石, FCL・IMMT治具の製作
- 6/8 大石, 土井・IMMT鏡の取出し
IMMT1 mirror removal http://klog.icrr.u-tokyo.ac.jp/osl/?r=2886
- Refcavの性能評価、デジタル接続、リモート化、自動化
FSS Parameters http://klog.icrr.u-tokyo.ac.jp/osl/?r=2853 (optical gain may not be correct)
Two dehumidifiers http://klog.icrr.u-tokyo.ac.jp/osl/?r=2854
AOM double path http://klog.icrr.u-tokyo.ac.jp/osl/?r=2871
Diffraction efficiency http://klog.icrr.u-tokyo.ac.jp/osl/?r=2925
Double path curved mirror fine adjusted http://klog.icrr.u-tokyo.ac.jp/osl/?r=2880
AC off test http://klog.icrr.u-tokyo.ac.jp/osl/?r=2892
6/12-6/16
- 苔山・中野・下田
- ケーブル、ラックの整理、IMCへ光を出す準備
Preparation for IMC input beam http://klog.icrr.u-tokyo.ac.jp/osl/?r=2902
Beam shoots on MCI http://klog.icrr.u-tokyo.ac.jp/osl/?r=2917
- TTFSS (FSS) Problem - it works in Mozumi by Shimode-san
TTFSS (PMC) Problem - it works in Mozumi by Shimode-san => To be checked in the mine by AEL
Solved, likely DC power supply problem http://klog.icrr.u-tokyo.ac.jp/osl/?r=2935
IMC flush!! http://klog.icrr.u-tokyo.ac.jp/osl/?r=2934
IOO rack re-configured http://klog.icrr.u-tokyo.ac.jp/osl/?r=2941
IMC locked!! http://klog.icrr.u-tokyo.ac.jp/osl/?r=2942
- 大石, FCL・IMMT治具の製作
- 6/14 大石, 土井, 桐井 IMMT2 mirror取り出し
- 大石, 6/19までに新しい治具を柏に送る
- 6/16 午前 ラック関係の停電準備
- Around MCF; Unplugged AC power cables:
- MCI oplev light
- MCO oplev light
- Thorlab DCPD
- MCI picomotor
- MCO picomotor
- Koach filter x 2
- White tap, going to MCI/O picomotor
- Around MCF; Unplugged AC power cables:
6/19
停電準備
- クリーンルームの設備に関しては金曜日には何もせず、月曜朝まで通常運転をする。
- 月曜の朝、苔山・川村で湿度計のモニターを見ながら最低レベルまで下がったところで、冷房の外からのファンと冷房を同時にOFFにする。
- 冷房の吹き出し口をシートで塞ぐ。
- 除湿機1台、コーチフィルター2台(中央上)を残して後はOFFにする。
- 前室とクリーンルームの間(上部)を閉める。
- 電気を消す。
- ドアを閉める。
- 外からテープでシールする。
- 9:00 停電
- 17:00 復電
6/20
- 復電
6/19-6/24
MC-PR, BS エリアの電源設置工事 6/24終了
PR2, BS(+Y) は 6/23 終了
MCF-PRエリア床清掃、床張り 6/28終了
6/21 - 6/23
- IMC Characterization 中野・下田・苔山
IMC input power reduced to 2mW http://klog.icrr.u-tokyo.ac.jp/osl/?r=2954
oplev centered http://klog.icrr.u-tokyo.ac.jp/osl/?r=2945
IMC parameters http://klog.icrr.u-tokyo.ac.jp/osl/?r=2979
IMC parameters 2 http://klog.icrr.u-tokyo.ac.jp/osl/?r=2985
AOM path preparation http://klog.icrr.u-tokyo.ac.jp/osl/?r=2993
FSS & IMC Guardian by Shimoda
- 廣瀬・鏡の移動、磁石とスタンドオフの接着
6/26-6/30
- 苔山・中野・下田・Stefan B
IMC locked with AOM! http://klog.icrr.u-tokyo.ac.jp/osl/?r=3001
OLG of IMC-FSS combined system http://klog.icrr.u-tokyo.ac.jp/osl/?r=3012
- Got rid of power reels! (6/28, no klog)
Strange mirror behavior http://klog.icrr.u-tokyo.ac.jp/osl/?r=3013
Found NIM power crate broken http://klog.icrr.u-tokyo.ac.jp/osl/?r=3015
Laser room effect http://klog.icrr.u-tokyo.ac.jp/osl/?r=3017
Timing signal coupled http://klog.icrr.u-tokyo.ac.jp/osl/?r=3024
- 廣瀬・磁石とスタンドオフの接着
- ペリカンケースを神岡から柏まで運ぶ。その後、柏で磁石やスタンドオフをつけ、再び神岡まで運ぶ
- 柏での接着に大石さんも立ち会う
7月
7/3-7/7
- 中野・下田
Ground hunting http://klog.icrr.u-tokyo.ac.jp/osl/?r=3065
- IMC-FSS characteristics
7/10-7/14
- 中野・長野(k)・苔山
15h lock * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3076
IMC-FSS transfer functions http://klog.icrr.u-tokyo.ac.jp/osl/?r=3084
Air effects on FSS http://klog.icrr.u-tokyo.ac.jp/osl/?r=3097
Laser pwr < 2mW
- MCE, SRエリアの電源設置工事
- 大石・高橋 IMMT mirror magnet glueing
- 7/12 KK will be out for outreach in Toyama High
IMC-WFS preparation IMCASC
7/17-7/21
- 中野・長野(k)・苔山
- PSL 光分ける
Beam Profile http://klog.icrr.u-tokyo.ac.jp/osl/?r=3117
Beam Profile corrected http://klog.icrr.u-tokyo.ac.jp/osl/?r=3122
Alignment almost done http://klog.icrr.u-tokyo.ac.jp/osl/?r=3124
Bypass finished! http://klog.icrr.u-tokyo.ac.jp/osl/?r=3136
- WFS tuning
Cannot be tuned http://klog.icrr.u-tokyo.ac.jp/osl/?r=3106
Tuned and returned http://klog.icrr.u-tokyo.ac.jp/osl/?r=3130
MC_REFL (both LSC and ASC) height changed to 4 inch http://klog.icrr.u-tokyo.ac.jp/osl/?r=3135
- 7/18・大石・IMMT installation
- IMCの透過光をIFIの手前でブロック
- 安全メガネを着用して、フランジを開ける。(大石)
- 安全メガネを着用して、ビームダンパーをIFIの前に設置。
- 以降の作業は安全メガネは必要ない。
IMMT1 mirror moved to chamber, not suspended yet http://klog.icrr.u-tokyo.ac.jp/osl/?r=3119
IMMT2 suspension taken out http://klog.icrr.u-tokyo.ac.jp/osl/?r=3134
7/21・阿久津・苔山 IMMT1 viewports & pylon インストール
7/24-7/28
- 中野・長野(k)・長野(s)
- PSL 光分ける
Bypass path is not aligned http://klog.icrr.u-tokyo.ac.jp/osl/?r=3157
Bypass path alined http://klog.icrr.u-tokyo.ac.jp/osl/?r=3178
WFS tuning Done
- IMC-WFS measurement
WFS path profile http://klog.icrr.u-tokyo.ac.jp/osl/?r=3141
WFS re-installed http://klog.icrr.u-tokyo.ac.jp/osl/?r=3156
- 7/25-26 IMC リークテスト
- 大石・IMMT1 mirror suspended
- IMMT1 viewport 取り替え
8月
7/31 - 8/4
- 中野・長野(k)・長野(s)・苔山・野替 (8/2-3)
- 月〜火 IMMT2 インスタレーション
- IMMT1 transfer function
Strange TF http://klog.icrr.u-tokyo.ac.jp/osl/?r=3182
Coil driver changed and TF OK http://klog.icrr.u-tokyo.ac.jp/osl/?r=3210
IMMT2 suspended (outside) http://klog.icrr.u-tokyo.ac.jp/osl/?r=3187
IMMT2 installed, TF OK http://klog.icrr.u-tokyo.ac.jp/osl/?r=3194
IMMT1, 2 first contacts removed http://klog.icrr.u-tokyo.ac.jp/osl/?r=3213
- IMMT1 transfer function
- 水 IFI に光を通す確認
IMM-PRM duct removed http://klog.icrr.u-tokyo.ac.jp/osl/?r=3203
- 水〜金 IMC ASC
WFS signals were seen http://klog.icrr.u-tokyo.ac.jp/osl/?r=3218
- PSL
FSS's LO was lost http://klog.icrr.u-tokyo.ac.jp/osl/?r=3207
Function generator replaced http://klog.icrr.u-tokyo.ac.jp/osl/?r=3215
IMC lockloss due to air conditioning? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3214
IFIブロックのときに使ったのはSTM2のみだったか?(見て確認)
- エアガンをつけかえる準備 (Not Done!)
アルミ箔を調達
- PR2-3 2mW が出ることのアナウンス
8/7 - 8/10
- 苔山
- 川村先生北京で不在
- laser pwr 2mW
- 8/8 IMMT1 TRANS ブレッドボード納品 (神岡)
- 8/10 IMMT1 TRANS ブレッドボードインストール (古畑・苔山)
道村・新潟大(菅井・中村・平田 (8/8-9))・武田・ビームプロファイルとIMMT位置調整
Notes
- PR2-3間にウエストがあるので、そこまで測る(アルミの台使う)
- 週後半PRMサイドでPRMのくみたて始まるので注意
- PRMはないので beam profile は計算上混みでよくなるようにする
- IMMT1-2の距離調整おこなう
- 今回はPR2-3 距離の調整は行わない
- テフロンシートありでやる
光軸の高さは IMMT1で220mm Done、IMMT2で210mmであることを確認する
- IMMT2透過光光学系を確認する
Daily ToDo
- Monday
IMM-PRMの間をアルミでつなぐ Done
- Tuesday
台を使わせてもらう (near PR2, AOS tool rack の横の)、使い終わったらクリーンブース内に入れておくかカバーをかぶせて外に
windows 入りの macbook を用意。Software用意。
ベローズをどけてコーチがPR3へ行き来できるようにする
IMMT2の土台をずらす(大石さん)
PRM の空気入れフランジをとりつける。(鈴木さん)
- Wednesday
PRM の +X, +Y フランジ蓋をとりはずし、アルミでふさぐ。光を通す穴を開ける。
- Thursday
- beam profiler soft 設定間違っていたので測定し直した
Logs
IMMT1,2 alignment etc http://klog.icrr.u-tokyo.ac.jp/osl/?r=3235
Measurement 1 http://klog.icrr.u-tokyo.ac.jp/osl/?r=3240
Measurement 2 (Success!) http://klog.icrr.u-tokyo.ac.jp/osl/?r=3245
Preparation for Next week
oplev x 2 (Thanks to Simon & Akutsu-san)
- Damp for IMMT1 (recycle the one already in IMMT1)
- oplev反射鏡 x 1 (holder, pedestal are ready, mirror is missing)
IMMT2 透過ステアリングのミラー x 2 (recycle iKAGRA-IMMT1&2 - pedestals and mounts are ready)
IMMT2のifoからの戻り光のDamper
8/11 - 8/15
Obon Brake KAGRA Closed
8/16-8/18
- 苔山・有富
- 野替・中村・平田・Chen 8/17-18?
- laser pwr 500mW
寺田, 新潟大・IMMT oplev & beam damp installation
- Items to be installed
- oplev x 2
- Damp for IMMT1
- oplev反射鏡 x 1 (IMMT2のうしろ)
- IMMT2 透過ステアリングのミラー x 2 (IMMT2のうしろ)
IMMT2のifoからの戻り光のDamper
MC power 40mW http://klog.icrr.u-tokyo.ac.jp/osl/?r=3253
IMMT1, 2 oplev light and QPD installation http://klog.icrr.u-tokyo.ac.jp/osl/?r=3257
Installation log http://klog.icrr.u-tokyo.ac.jp/osl/?r=3257
- Beam damp入れてない
- iKAGRAで使用したIMMT1, 2 のミラーはPSL前室のデシケーターに入れた
- IMMT2のoplevのフォールディングミラーにはiKAGRAのIMMT1のトランスに使用したステアリングミラーを使用した
- IMMT2からメイン干渉計に行くビームがyawの+方向に大きくずれているが、IMMT2の調整は行わなかった
- はさみ半分IFIタンクの底に落としました (2017.8.18 寺田)
8/21-8/25
- 苔山・有富
- 8/21 No site work (拡大チーフ会議)
- 8/21 - IMC ASC
MCO has bad coil balance http://klog.icrr.u-tokyo.ac.jp/osl/?r=3295
No valid signals seen http://klog.icrr.u-tokyo.ac.jp/osl/?r=3302
Phase-1 ISS の M24, AOM インストール (古畑・酒本) 9/4以降に延期
8/28-8/30
- 苔山
- 8/28 ミスミ納品
DCQPD will be delivered
- 8/29 IMMT1, 2 の EQ stop をリリースする(大石)
8/28-30 F2F meeting at Toyama U
- 8/31 IMMT1, 2 のコイルバランスをラフに確認する (苔山)
9月
9/4-8
- 9/4 IMMT1,2 oplev 再調整 (阿久津, 苔山)
- 9/4? IMC-ASC (道村, 苔山)
- 9/6-8 ISS (古畑・酒本)
- IFI横のゴーストビームをダンプする (ダンプがP偏光用のはず by 阿久津)
9/11-15
- ISS (古畑・酒本)
- IMC-WFS (苔山, 野替)
9/14 に BS installation 完了予定 Delayed
9/22 BS cabling 終了予定 Delayed, Commissioning starts on 10/2
- 9/19 に PRM installation 完了予定
- BS が入り Yend までビームを飛ばす時に IMMT1,2 の位置を確定、テフロンシートをとり敷板を入れる (大石)
- Yend での Beam profile (MIF?)
9/19-22
苔山不在 (KEK meeting & 京都大)
- ISS?
9/25-29
- ISS
- 9/26 午後 ビームシャッターインストール (宗宮)
Later
- ETMY 10月
- ビームを BS に送る
- X end まで光を送りたい
- その後メイン干渉計がOKか確認して IMM-PRM ダクト締結
- PR3-PR2 ダクトは Y end の real suspension インストール終了次第 (かつPR系全部入ったら?)閉じる
- ISS 1st loop
- Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月)