== Overview == === Fiscal 2017 === || || PSL || ISS || IMC || IMMT || Tilt || OMC || Green || || 4月 || Main path || || || || 設計 || || || || 5月 ||FSS install, PMC製作 || || || 治具設計 || 製作 || || || || 6月 ||PMC install || AOM install || || 治具製作、鏡取り出し、接着 ||製作 || || Pickoff || || 7月 || || || || 鏡installation, integration || 製作 || || || || 8月 || || || Lock || Beam profile || 製作 || || || || 9月 || || ISS || WFS || || || || || || 10月 || || || || || Installation || || Installation || || 11月 || || || || || || || || || 12月 || || || || || || || || || 1月 || || || || || || || || || 2月 || || || || || || || || || 3月 || || || || || || || || |
|
Line 35: | Line 52: |
=== 5/29-6/2 | === 5/29-6/2 === |
Schedule
Overview
Fiscal 2017
|
PSL |
ISS |
IMC |
IMMT |
Tilt |
OMC |
Green |
4月 |
Main path |
|
|
|
設計 |
|
|
5月 |
FSS install, PMC製作 |
|
|
治具設計 |
製作 |
|
|
6月 |
PMC install |
AOM install |
|
治具製作、鏡取り出し、接着 |
製作 |
|
Pickoff |
7月 |
|
|
|
鏡installation, integration |
製作 |
|
|
8月 |
|
|
Lock |
Beam profile |
製作 |
|
|
9月 |
|
ISS |
WFS |
|
|
|
|
10月 |
|
|
|
|
Installation |
|
Installation |
11月 |
|
|
|
|
|
|
|
12月 |
|
|
|
|
|
|
|
1月 |
|
|
|
|
|
|
|
2月 |
|
|
|
|
|
|
|
3月 |
|
|
|
|
|
|
|
4月 PSL Main Optical Path
4/10-14
- Mon-Tue: 中野・苔山
- Wed-Fri: 苔山・榎本
- 物品確認
- チェックポイントは?
- レンズ購入?
4/17-4/21
- 苔山・中野・榎本
4/24-4/28
- 苔山・中野
5月 FSS, IMMT
5/1-5/2
- 苔山・中野
5/8-5/12
- GWADW
5/15-5/19
- 苔山・中野・榎本
- 大石・IMMT治具の設計
5/22-5/26
- 苔山・中野・榎本
- 大石・IMMT治具の設計
5/29-6/2
- 大石・IMMT治具の設計
6月
- FSS
- PMC(製作)
- ISS用のAOMをPSLテーブルにインストール(富山大)
- グリーン用のpickoffミラーをPSLテーブルにインストール(富山大)
- IMMT(治具の製作; 6/5-6/16; 大石)
- IMMT(鏡の取出し; 6/19-6/23; 大石)
- IMMT(鏡の柏への移動、磁石とスタンドオフの接着、鏡の神岡への移動; 6/26-7/7デフォルトスケジュール; 廣瀬)
7月
- PMC(インストレーション)
- IMCへのビーム出射
- IMMT(鏡のインストレーション; 7/10-7/14; 大石)
8月
- IMCロック
- IMMT(ビームプロファイル)
- ビームをBSに送る
9月
- IMC-WFS
ISS 1st loop & 2nd loop, (富山大)