Differences between revisions 79 and 154 (spanning 75 versions)
Revision 79 as of 2017-06-02 09:06:09
Size: 4391
Comment:
Revision 154 as of 2017-07-23 21:43:17
Size: 10239
Comment:
Deletions are marked like this. Additions are marked like this.
Line 59: Line 59:
 * 苔山・中野・長野(s)  * 苔山・中野・長野(s)・山本(k)
Line 65: Line 65:
 * Measurement of [mV/MHz] http://klog.icrr.u-tokyo.ac.jp/osl/?r=2842 Agreed with Nakano-kun's another measurement  * Measurement of [mV/MHz] http://klog.icrr.u-tokyo.ac.jp/osl/?r=2842 --(Agreed with Nakano-kun's another measurement)-- Calibration may not have been correct
 * Changing PSL room temperature http://klog.icrr.u-tokyo.ac.jp/osl/?r=2845
Line 70: Line 71:
 * 苔山・中野・長野(s)  * 苔山・中野・長野(s)・山本(k)
 * 大石, FCL・IMMT治具の製作
 * 6/8 大石, 土井・IMMT鏡の取出し
   * IMMT1 mirror removal http://klog.icrr.u-tokyo.ac.jp/osl/?r=2886
Line 72: Line 76:
 * 大石, FCL・IMMT治具の製作
 * 大石, 土井・IMMT鏡の取出し -> すぐにケースに入れ、ペリカンケースに入れて、レーザールーム前室に置いておく
   * FSS Parameters http://klog.icrr.u-tokyo.ac.jp/osl/?r=2853 (optical gain may not be correct)
   * Two dehumidifiers http://klog.icrr.u-tokyo.ac.jp/osl/?r=2854
   * AOM double path http://klog.icrr.u-tokyo.ac.jp/osl/?r=2871
   * Diffraction efficiency http://klog.icrr.u-tokyo.ac.jp/osl/?r=2925
   * Double path curved mirror fine adjusted http://klog.icrr.u-tokyo.ac.jp/osl/?r=2880
   * AC off test http://klog.icrr.u-tokyo.ac.jp/osl/?r=2892
Line 77: Line 85:
  * ケーブル、ラックの整理、IMCへ光を出す準備
    * Preparation for IMC input beam http://klog.icrr.u-tokyo.ac.jp/osl/?r=2902
    * Beam shoots on MCI http://klog.icrr.u-tokyo.ac.jp/osl/?r=2917
    * TTFSS (FSS) Problem - it works in Mozumi by Shimode-san
    * TTFSS (PMC) Problem - it works in Mozumi by Shimode-san => To be checked in the mine by AEL
      * Solved, likely DC power supply problem http://klog.icrr.u-tokyo.ac.jp/osl/?r=2935
    * IMC flush!! http://klog.icrr.u-tokyo.ac.jp/osl/?r=2934
    * IOO rack re-configured http://klog.icrr.u-tokyo.ac.jp/osl/?r=2941
    * IMC locked!! http://klog.icrr.u-tokyo.ac.jp/osl/?r=2942
Line 78: Line 95:
  * 大石, 土井・IMMT鏡の取出し -> すぐにケースに入れ、ペリカンケースに入れて、レーザールーム前室に置いておく   * 6/14 大石, 土井, 桐井 IMMT2 mirror取り出し
    * http://klog.icrr.u-tokyo.ac.jp/osl/?r=2918
Line 80: Line 98:
=== 6/16 ===
 * 午前 ラック関係の停電準備
  * 6/16 午前 ラック関係の停電準備
    * Around MCF; Unplugged AC power cables:
      * MCI oplev light
      * MCO oplev light
      * Thorlab DCPD
      * MCI picomotor
      * MCO picomotor
      * Koach filter x 2
      * White tap, going to MCI/O picomotor
Line 84: Line 110:
 * 午前 レーザーなどのシャットダウン
 * 停電
==== 停電準備 ====
 1. クリーンルームの設備に関しては金曜日には何もせず、月曜朝まで通常運転をする。
 1. 月曜の朝、苔山・川村で湿度計のモニターを見ながら最低レベルまで下がったところで、冷房の外からのファンと冷房を同時にOFFにする。
 1. 冷房の吹き出し口をシートで塞ぐ。
 1. 除湿機1台、コーチフィルター2台(中央上)を残して後はOFFにする。
 1. 前室とクリーンルームの間(上部)を閉める。
 1. 電気を消す。
 1. ドアを閉める。
 1. 外からテープでシールする。

 * 9:00 停電
 * 17:00 復電
Line 90: Line 127:
 * MC-PR, BS エリアの電源設置工事
 * PR2, BS(+Y) は 6/23
 * --(MC-PR, BS エリアの電源設置工事)-- 6/24終了
 * --(PR2, BS(+Y) は 6/23)-- 終了
 * --(MCF-PRエリア床清掃、床張り)-- 6/28終了
Line 94: Line 132:
 * 苔山・中野・下田  * IMC Characterization 中野・下田・苔山
   * IMC input power reduced to 2mW http://klog.icrr.u-tokyo.ac.jp/osl/?r=2954
   * oplev centered http://klog.icrr.u-tokyo.ac.jp/osl/?r=2945
   * IMC parameters http://klog.icrr.u-tokyo.ac.jp/osl/?r=2979
   * IMC parameters 2 http://klog.icrr.u-tokyo.ac.jp/osl/?r=2985
   * AOM path preparation http://klog.icrr.u-tokyo.ac.jp/osl/?r=2993
  * FSS & IMC Guardian by Shimoda
Line 98: Line 142:
  * 苔山・中野・下田
  * 廣瀬・鏡の移動、磁石とスタンドオフの接着
  * 苔山・中野・下田・Stefan B
    * IMC locked with AOM! http://klog.icrr.u-tokyo.ac.jp/osl/?r=3001
    * OLG of IMC-FSS combined system http://klog.icrr.u-tokyo.ac.jp/osl/?r=3012
    * Got rid of power reels! (6/28, no klog)
    * Strange mirror behavior http://klog.icrr.u-tokyo.ac.jp/osl/?r=3013
    * Found NIM power crate broken http://klog.icrr.u-tokyo.ac.jp/osl/?r=3015
    * Laser room effect http://klog.icrr.u-tokyo.ac.jp/osl/?r=3017
    * Timing signal coupled http://klog.icrr.u-tokyo.ac.jp/osl/?r=3024
  * 廣瀬・磁石とスタンドオフの接着
Line 106: Line 157:
  * 苔山・中野・下田
 * 大石, 土井, 桐井・IMMT鏡のインストレーション
 * 大石・FC剥がし

=== 7/10-7/24 ===
 * 苔山・中野
  * 中野・下田
  * 60Hz peak http://klog.icrr.u-tokyo.ac.jp/osl/?r=3046
  * Ground hunting http://klog.icrr.u-tokyo.ac.jp/osl/?r=3065
  * IMC-FSS characteristics

=== 7/10-7/14 ===
 * 中野・長野(k)・苔山
    * 15h lock * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3076
    * IMC-FSS transfer functions http://klog.icrr.u-tokyo.ac.jp/osl/?r=3084
   * Air effects on FSS http://klog.icrr.u-tokyo.ac.jp/osl/?r=3097
 * Laser pwr < 2mW
Line 113: Line 169:
 * 大石, 苔山・IMMTのインテグレーション  * 大石・高橋 IMMT mirror magnet glueing
   * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3080
 * 7/12 KK will be out for outreach in Toyama High
 * IMC-WFS preparation [[../MC/IMCWFS|IMCASC]]
Line 116: Line 176:
  * 苔山・中野・長野(s)
 * 大石, 苔山・IMMTのインテグレーション

=== 7/14-7/27 ===
  * 苔山・中野・有富・長野(s)
  * 中野・長野(k)・苔山
  * PSL 光分ける
    * Beam Profile http://klog.icrr.u-tokyo.ac.jp/osl/?r=3117
    * Beam Profile corrected http://klog.icrr.u-tokyo.ac.jp/osl/?r=3122
    * Alignment almost done http://klog.icrr.u-tokyo.ac.jp/osl/?r=3124
    * Bypass finished! http://klog.icrr.u-tokyo.ac.jp/osl/?r=3136
  * WFS tuning
      * Cannot be tuned http://klog.icrr.u-tokyo.ac.jp/osl/?r=3106
      * Tuned and returned http://klog.icrr.u-tokyo.ac.jp/osl/?r=3130
  * MC_REFL (both LSC and ASC) height changed to 4 inch http://klog.icrr.u-tokyo.ac.jp/osl/?r=3135
  * 7/18・大石・IMMT installation
    * IMCの透過光をIFIの手前でブロック
    * 安全メガネを着用して、フランジを開ける。(大石)
    * 安全メガネを着用して、ビームダンパーをIFIの前に設置。
    * 以降の作業は安全メガネは必要ない。
    * IMMT1 mirror moved to chamber, not suspended yet http://klog.icrr.u-tokyo.ac.jp/osl/?r=3119
    * IMMT2 suspension taken out http://klog.icrr.u-tokyo.ac.jp/osl/?r=3134
  * 7/21・阿久津・苔山 IMMT1 viewports & pylon インストール
    * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3138
    * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3139
    * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3140

=== 7/24-7/28 ===
  * 中野・長野(k)・長野(s)
  * PSL 光分ける
  * WFS tuning
  * IMC-WFS measurement
     * Signal extraction
     * Sensing matrix
     * Control loops
  * 7/25-26 IMC リークテスト
  * 大石・苔山・IMMT integration (no oplev)
  * IMMT1 viewport 取り替え?
Line 123: Line 211:
  * 苔山・中野・有富(-8/18)
 * IMCロック
 * IMMT(ビームプロファイル)
=== 7/31 - 8/4 ===
 * 中野・長野(k)・長野(s)・苔山
 * IMMT1 oplev/ISS 定盤搬入?
 * PMC related tasks (split the PSL beam?)

=== 8/7 - 8/10 ===
 * 中野・苔山
 * 道村・新潟大・ビームプロファイルとIMMT位置調整

=== 8/11 - 8/15 ===
 ''' Obon Brake KAGRA Closed '''

=== 8/16-8/18 ===
 * 寺田, 新潟大・IMMT oplev & beam dumper installation
 * Items to be installed
    * IMMT1 oplev
    * Damper for IMMT1
    * IMMT2 oplev, oplev反射鏡
    * 透過ステアリングのミラー (=>IMMT2 Trans)
    * IMMT2のifoからの戻り光のDamper
       * IMMT2 POM1にあたるかもしれないIFO戻り光のIMMT2透過2次光はダンプしない



=== 8/21-8/25 ===
 * 苔山・IMMT integration w/ oplevs

=== 8/28-8/30 ===
 * F2F meeting in Toyama
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0035/D1503562/002/Oplev_QPDiam.pdf|DCQPD]] will be delivered
Line 127: Line 242:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2017August|F2F meeting at Toyama U]]

Schedule

4月

4/10-14

4/17-4/21

4/24-4/28

5月

5/1-5/2

  • なし

5/8-5/12

  • GWADW

5/15-5/19

5/22-5/26

5/29-6/2

6月

6/5-6/9

6/12-6/16

6/19

停電準備

  1. クリーンルームの設備に関しては金曜日には何もせず、月曜朝まで通常運転をする。
  2. 月曜の朝、苔山・川村で湿度計のモニターを見ながら最低レベルまで下がったところで、冷房の外からのファンと冷房を同時にOFFにする。
  3. 冷房の吹き出し口をシートで塞ぐ。
  4. 除湿機1台、コーチフィルター2台(中央上)を残して後はOFFにする。
  5. 前室とクリーンルームの間(上部)を閉める。
  6. 電気を消す。
  7. ドアを閉める。
  8. 外からテープでシールする。
  9. 9:00 停電
  10. 17:00 復電

6/20

  • 復電

6/19-6/24

  • MC-PR, BS エリアの電源設置工事 6/24終了

  • PR2, BS(+Y) は 6/23 終了

  • MCF-PRエリア床清掃、床張り 6/28終了

6/21 - 6/23

6/26-6/30

7月

7/3-7/7

7/10-7/14

7/17-7/21

7/24-7/28

  • 中野・長野(k)・長野(s)
  • PSL 光分ける
  • WFS tuning
  • IMC-WFS measurement
    • Signal extraction
    • Sensing matrix
    • Control loops
  • 7/25-26 IMC リークテスト
  • 大石・苔山・IMMT integration (no oplev)
  • IMMT1 viewport 取り替え?

8月

7/31 - 8/4

  • 中野・長野(k)・長野(s)・苔山
  • IMMT1 oplev/ISS 定盤搬入?
  • PMC related tasks (split the PSL beam?)

8/7 - 8/10

  • 中野・苔山
  • 道村・新潟大・ビームプロファイルとIMMT位置調整

8/11 - 8/15

  • Obon Brake KAGRA Closed

8/16-8/18

  • 寺田, 新潟大・IMMT oplev & beam dumper installation

  • Items to be installed
    • IMMT1 oplev
    • Damper for IMMT1
    • IMMT2 oplev, oplev反射鏡
    • 透過ステアリングのミラー (=>IMMT2 Trans)

    • IMMT2のifoからの戻り光のDamper
      • IMMT2 POM1にあたるかもしれないIFO戻り光のIMMT2透過2次光はダンプしない

8/21-8/25

  • 苔山・IMMT integration w/ oplevs

8/28-8/30

9月

  • IMC-WFS
  • ISS 1st loop, (富山大)

table layout

KAGRA/Subgroups/IOO/schedule (last edited 2017-09-27 18:16:58 by KeikoKokeyama)