Differences between revisions 81 and 125 (spanning 44 versions)
Revision 81 as of 2017-06-06 08:14:22
Size: 4442
Comment:
Revision 125 as of 2017-07-10 10:15:02
Size: 7761
Comment:
Deletions are marked like this. Additions are marked like this.
Line 59: Line 59:
 * 苔山・中野・長野(s)  * 苔山・中野・長野(s)・山本(k)
Line 65: Line 65:
 * Measurement of [mV/MHz] http://klog.icrr.u-tokyo.ac.jp/osl/?r=2842 Agreed with Nakano-kun's another measurement  * Measurement of [mV/MHz] http://klog.icrr.u-tokyo.ac.jp/osl/?r=2842 --(Agreed with Nakano-kun's another measurement)-- Calibration may not have been correct
 * Changing PSL room temperature http://klog.icrr.u-tokyo.ac.jp/osl/?r=2845
Line 70: Line 71:
 * 苔山・中野・長野(s)  * 苔山・中野・長野(s)・山本(k)
 * 大石, FCL・IMMT治具の製作
 * 6/8 大石, 土井・IMMT鏡の取出し
   * IMMT1 mirror removal http://klog.icrr.u-tokyo.ac.jp/osl/?r=2886
Line 72: Line 76:
 * 大石, FCL・IMMT治具の製作
 * 6/8 大石, 土井・IMMT鏡の取出し -> すぐにケースに入れ、ペリカンケースに入れて、レーザールーム前室に置いておく
 * FSS Parameters http://klog.icrr.u-tokyo.ac.jp/osl/?r=2853
   * FSS Parameters http://klog.icrr.u-tokyo.ac.jp/osl/?r=2853 (optical gain may not be correct)
   * Two dehumidifiers http://klog.icrr.u-tokyo.ac.jp/osl/?r=2854
   * AOM double path http://klog.icrr.u-tokyo.ac.jp/osl/?r=2871
   * Diffraction efficiency http://klog.icrr.u-tokyo.ac.jp/osl/?r=2925
   * Double path curved mirror fine adjusted http://klog.icrr.u-tokyo.ac.jp/osl/?r=2880
   * AC off test http://klog.icrr.u-tokyo.ac.jp/osl/?r=2892
Line 78: Line 85:
  * ケーブル、ラックの整理、IMCへ光を出す準備
    * Preparation for IMC input beam http://klog.icrr.u-tokyo.ac.jp/osl/?r=2902
    * Beam shoots on MCI http://klog.icrr.u-tokyo.ac.jp/osl/?r=2917
    * TTFSS (FSS) Problem - it works in Mozumi by Shimode-san
    * TTFSS (PMC) Problem - it works in Mozumi by Shimode-san => To be checked in the mine by AEL
      * Solved, likely DC power supply problem http://klog.icrr.u-tokyo.ac.jp/osl/?r=2935
    * IMC flush!! http://klog.icrr.u-tokyo.ac.jp/osl/?r=2934
    * IOO rack re-configured http://klog.icrr.u-tokyo.ac.jp/osl/?r=2941
    * IMC locked!! http://klog.icrr.u-tokyo.ac.jp/osl/?r=2942
Line 79: Line 95:
  * 6/14-15 大石, 土井・IMMT鏡の取出し -> すぐにケースに入れ、ペリカンケースに入れて、レーザールーム前室に置いておく   * 6/14 大石, 土井, 桐井 IMMT2 mirror取り出し
    * http://klog.icrr.u-tokyo.ac.jp/osl/?r=2918
Line 82: Line 99:
    * Around MCF; Unplugged AC power cables:
      * MCI oplev light
      * MCO oplev light
      * Thorlab DCPD
      * MCI picomotor
      * MCO picomotor
      * Koach filter x 2
      * White tap, going to MCI/O picomotor
Line 84: Line 110:
 * 午前 レーザーなどのシャットダウン
 * 停電
==== 停電準備 ====
 1. クリーンルームの設備に関しては金曜日には何もせず、月曜朝まで通常運転をする。
 1. 月曜の朝、苔山・川村で湿度計のモニターを見ながら最低レベルまで下がったところで、冷房の外からのファンと冷房を同時にOFFにする。
 1. 冷房の吹き出し口をシートで塞ぐ。
 1. 除湿機1台、コーチフィルター2台(中央上)を残して後はOFFにする。
 1. 前室とクリーンルームの間(上部)を閉める。
 1. 電気を消す。
 1. ドアを閉める。
 1. 外からテープでシールする。

 * 9:00 停電
 * 17:00 復電
Line 90: Line 127:
 * MC-PR, BS エリアの電源設置工事
 * PR2, BS(+Y) は 6/23
 * --(MC-PR, BS エリアの電源設置工事)-- 6/24終了
 * --(PR2, BS(+Y) は 6/23)-- 終了
 * --(MCF-PRエリア床清掃、床張り)-- 6/28終了
Line 94: Line 132:
 * 苔山・中野・下田  * IMC Characterization 中野・下田・苔山
   * IMC input power reduced to 2mW http://klog.icrr.u-tokyo.ac.jp/osl/?r=2954
   * oplev centered http://klog.icrr.u-tokyo.ac.jp/osl/?r=2945
   * IMC parameters http://klog.icrr.u-tokyo.ac.jp/osl/?r=2979
   * IMC parameters 2 http://klog.icrr.u-tokyo.ac.jp/osl/?r=2985
   * AOM path preparation http://klog.icrr.u-tokyo.ac.jp/osl/?r=2993
  * FSS & IMC Guardian by Shimoda
Line 98: Line 142:
  * 苔山・中野・下田   * 苔山・中野・下田・Stefan B
    * IMC locked with AOM! http://klog.icrr.u-tokyo.ac.jp/osl/?r=3001
    * OLG of IMC-FSS combined system http://klog.icrr.u-tokyo.ac.jp/osl/?r=3012
    * Got rid of power reels! (6/28, no klog)
    * Strange mirror behavior http://klog.icrr.u-tokyo.ac.jp/osl/?r=3013
    * Found NIM power crate broken http://klog.icrr.u-tokyo.ac.jp/osl/?r=3015
    * Laser room effect http://klog.icrr.u-tokyo.ac.jp/osl/?r=3017
    * Timing signal coupled http://klog.icrr.u-tokyo.ac.jp/osl/?r=3024
Line 106: Line 157:
  * 苔山・中野・下田
 * 大石, 土井, 桐井・IMMT鏡のインストレーション
 * 大石・FC剥がし
  * 中野・下田
  * 60Hz peak http://klog.icrr.u-tokyo.ac.jp/osl/?r=3046
  * Ground hunting http://klog.icrr.u-tokyo.ac.jp/osl/?r=3065
  * 大石, 土井, 桐井・IMMT鏡のインストレーション (?)
  * 大石・FC剥がし (?)
Line 111: Line 164:
 * 苔山・中野  * 中野・長野(k)・苔山
Line 113: Line 166:
 * 大石, 苔山・IMMTのインテグレーション  * 大石 IMMT mirror magnet glueing
 * 7/12 KK will be out for outreach in Toyama High
Line 116: Line 170:
  * 苔山・中野・長野(s)
 * 大石, 苔山・IMMTのインテグレーション
  * 中野・長野(k)・苔山
  * 大石, 苔山・IMMTのインテグレーション
Line 120: Line 174:
  * 苔山・中野・有富・長野(s)   * 中野・長野(k)・苔山
Line 123: Line 177:
  * 苔山・中野・有富(-8/18) === 7/31 - 8/4 ===
 * 中野・長野(k)・長野(s)・苔山
Line 126: Line 181:
 * IMMT1 oplev/ISS 定盤搬入
Line 127: Line 183:

=== 8/7 - 8/10 ===
 * 中野・長野(s)・苔山
 * 富山大 IMMT1's Oplev installation
 * 新潟大 IMMT1's ISS PD installation

Schedule

4月

4/10-14

4/17-4/21

4/24-4/28

5月

5/1-5/2

  • なし

5/8-5/12

  • GWADW

5/15-5/19

5/22-5/26

5/29-6/2

6月

6/5-6/9

6/12-6/16

6/19

停電準備

  1. クリーンルームの設備に関しては金曜日には何もせず、月曜朝まで通常運転をする。
  2. 月曜の朝、苔山・川村で湿度計のモニターを見ながら最低レベルまで下がったところで、冷房の外からのファンと冷房を同時にOFFにする。
  3. 冷房の吹き出し口をシートで塞ぐ。
  4. 除湿機1台、コーチフィルター2台(中央上)を残して後はOFFにする。
  5. 前室とクリーンルームの間(上部)を閉める。
  6. 電気を消す。
  7. ドアを閉める。
  8. 外からテープでシールする。
  9. 9:00 停電
  10. 17:00 復電

6/20

  • 復電

6/19-6/24

  • MC-PR, BS エリアの電源設置工事 6/24終了

  • PR2, BS(+Y) は 6/23 終了

  • MCF-PRエリア床清掃、床張り 6/28終了

6/21 - 6/23

6/26-6/30

7月

7/3-7/7

7/10-7/24

  • 中野・長野(k)・苔山
  • MCE, SRエリアの電源設置工事
  • 大石 IMMT mirror magnet glueing
  • 7/12 KK will be out for outreach in Toyama High

7/17-7/21

  • 中野・長野(k)・苔山
  • 大石, 苔山・IMMTのインテグレーション

7/14-7/27

  • 中野・長野(k)・苔山

8月

7/31 - 8/4

  • 中野・長野(k)・長野(s)・苔山
  • IMCロック
  • IMMT(ビームプロファイル)
  • IMMT1 oplev/ISS 定盤搬入
  • ビームをBSに送る

8/7 - 8/10

  • 中野・長野(s)・苔山
  • 富山大 IMMT1's Oplev installation
  • 新潟大 IMMT1's ISS PD installation

9月

  • IMC-WFS
  • ISS 1st loop, (富山大)

table layout

KAGRA/Subgroups/IOO/schedule (last edited 2017-09-27 18:16:58 by KeikoKokeyama)