<<TableOfContents(2)>> == October == === 10/2-10/6 === * --(ISS (Toyama U, Kokeyama, Nakano) )-- * --(QPD 組み立て IMC TRANS DCQPD (assemble also IMMT1T DCQPD) )-- => ペデスタル購入/スペーサ製作 * IMMT1, IMMT2 ミラーをリリースしてアライメント * IMMT1 Done http://klog.icrr.u-tokyo.ac.jp/osl/?r=3448 * IMMT2 * --( IMMT1,2 ピコモーター接続、動作テスト )-- Done http://klog.icrr.u-tokyo.ac.jp/osl/?r=3449 * IMMT2 TRANS、Oplev 引き回し * --(STM1, STM2, POM ピコモーター配線がきれていないか確認する)-- => きれてないっぽいが・・ * IMC/refcav normalization button http://klog.icrr.u-tokyo.ac.jp/osl/?r=3454 === 10/10- 10/14 === || IOO || IFO || || 1. ISS (PSL) || 2. Beam alignment from IMMT2&PR2 to PR3 || || 3. IMMT/PRM breadboard adjustment || || || 4. IMMT1T DCQPD || || 1. member 1. ToyamaU, Kokeyama 1. Kokeyama, Inoue?, Izumi?, Remote Michimura 1. Kokeyama === 10/16 - 10/20 === * Kokeyama will be away from 10/15 - 10/31, 中野君神岡にいてもらうことを了承 || IOO || IFO || || 1. ISS (PSL) || 2. PR3 alignment for EXA|| || 3. 10/18 真空シャッターテスト続き(宗宮) || || === 10/23 -10/27 === * Kokeyama will be away || IOO || IFO || || 1. 10/23 消音ダクト工事 (PSL) || 2. EYAに到達するまでのBSアラインメント || 1. 対応川村先生、レーザーつけたままゴーグルで作業してもらう 1. Izumi, Inoue, Remote Michimura === Later in Oct? === * --( Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月) )-- == November == * PSL DCQPD install - done [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3478|klog 3478]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3572|klog 3572]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3654|klog 3654]] * MCE DCQPD install - done [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3663|klog 3663]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3688|klog 3688]] == December == === 12/10 === * PMC (1st box) was delivered [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3807|photo]] === 12/14 === * Tiltsensors (3) were delivered === 12/13 === * ISS electronics install * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3830 * PSL model and daqd needs to be restarted * Dsub cables should be tightened on servo === 12/18 === * AC will be off due to the installation of the water pipes === 12/27 === * ISS AOM was properly cabled * Preparation for the PSL power change * ISS monitor channels were connected to the whitening filter before AA * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3830 === 12/28 === == January == === 1/9-12 === * IMC WFS? (野替) === 1/22-26 === * PMC installation? (田原) * RAM MON 準備1 (22-24, 上原) == Feb == === 2/5-7 === * RAM MON 準備2 (上原) |
Schedule 2017 Oct - Dec
October
10/2-10/6
ISS (Toyama U, Kokeyama, Nakano)
QPD 組み立て IMC TRANS DCQPD (assemble also IMMT1T DCQPD) => ペデスタル購入/スペーサ製作
- IMMT1, IMMT2 ミラーをリリースしてアライメント
IMMT1 Done http://klog.icrr.u-tokyo.ac.jp/osl/?r=3448
- IMMT2
IMMT1,2 ピコモーター接続、動作テスト Done http://klog.icrr.u-tokyo.ac.jp/osl/?r=3449
- IMMT2 TRANS、Oplev 引き回し
STM1, STM2, POM ピコモーター配線がきれていないか確認する => きれてないっぽいが・・
IMC/refcav normalization button http://klog.icrr.u-tokyo.ac.jp/osl/?r=3454
10/10- 10/14
IOO |
IFO |
1. ISS (PSL) |
2. Beam alignment from IMMT2&PR2 to PR3 |
3. IMMT/PRM breadboard adjustment |
|
4. IMMT1T DCQPD |
|
- member
- ToyamaU, Kokeyama
- Kokeyama, Inoue?, Izumi?, Remote Michimura
- Kokeyama
10/16 - 10/20
- Kokeyama will be away from 10/15 - 10/31, 中野君神岡にいてもらうことを了承
IOO |
IFO |
1. ISS (PSL) |
2. PR3 alignment for EXA |
3. 10/18 真空シャッターテスト続き(宗宮) |
|
10/23 -10/27
- Kokeyama will be away
IOO |
IFO |
1. 10/23 消音ダクト工事 (PSL) |
2. EYAに到達するまでのBSアラインメント |
- 対応川村先生、レーザーつけたままゴーグルで作業してもらう
- Izumi, Inoue, Remote Michimura
Later in Oct?
Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月)
November
December
12/10
PMC (1st box) was delivered photo
12/14
- Tiltsensors (3) were delivered
12/13
- ISS electronics install
- PSL model and daqd needs to be restarted
- Dsub cables should be tightened on servo
12/18
- AC will be off due to the installation of the water pipes
12/27
- ISS AOM was properly cabled
- Preparation for the PSL power change
- ISS monitor channels were connected to the whitening filter before AA
12/28
January
1/9-12
- IMC WFS? (野替)
1/22-26
- PMC installation? (田原)
- RAM MON 準備1 (22-24, 上原)
Feb
2/5-7
- RAM MON 準備2 (上原)