Line 16: Line 16:
 * IMC/refcav normalization button http://klog.icrr.u-tokyo.ac.jp/osl/?r=3454
Line 48: Line 48:
Line 50: Line 49:
 * Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月)  * --( Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月) )--
Line 53: Line 52:
 * PSL DCQPD install
 * Tiltsensor?
 * PSL DCQPD install - done [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3478|klog 3478]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3572|klog 3572]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3654|klog 3654]]
 * MCE DCQPD install - done [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3663|klog 3663]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3688|klog 3688]]
Line 57: Line 56:
 * AC installation in the PSL room
=== 12/10 ===
 * PMC (1st box) was delivered [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3807|photo]]

=== 12/14 ===
 * Tiltsensors (3) were delivered
=== 12/13 ===
 * ISS electronics install
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3830
  * PSL model and daqd needs to be restarted
  * Dsub cables should be tightened on servo
=== 12/18 ===
 * AC will be off due to the installation of the water pipes

=== 12/19 ===
 * ISS PDs install

=== 12/27-28 ===
 * ISS integration
  * 測定機器の確認
   * スペアナ(記憶媒体、データ変換機、操作方法を含む)場合によっては富山大から持ってくる
   * オシロスコープ

  * AOMケーブルの交換
  * PD入射レーザー強度を10mWにする
  * ループを閉じる
  * ロックでき、かつ時間が余っていたら測定してみる

== January ==

  * 強度安定化の測定
  * open loop伝達関数の測定

=== 1/9-12 ===
 * IMC WFS? (野替)

=== 1/22-26 ===
 * PMC installation? (田原)
 * RAM MON 準備1 (22-24, 上原)
== Feb ==

=== 2/5-7 ===
 * RAM MON 準備2 (上原)

Schedule 2017 Oct - Dec

October

10/2-10/6

10/10- 10/14

IOO

IFO

1. ISS (PSL)

2. Beam alignment from IMMT2&PR2 to PR3

3. IMMT/PRM breadboard adjustment

4. IMMT1T DCQPD

  1. member
  2. ToyamaU, Kokeyama
  3. Kokeyama, Inoue?, Izumi?, Remote Michimura
  4. Kokeyama

10/16 - 10/20

  • Kokeyama will be away from 10/15 - 10/31, 中野君神岡にいてもらうことを了承

IOO

IFO

1. ISS (PSL)

2. PR3 alignment for EXA

3. 10/18 真空シャッターテスト続き(宗宮)

10/23 -10/27

  • Kokeyama will be away

IOO

IFO

1. 10/23 消音ダクト工事 (PSL)

2. EYAに到達するまでのBSアラインメント

  1. 対応川村先生、レーザーつけたままゴーグルで作業してもらう
  2. Izumi, Inoue, Remote Michimura

Later in Oct?

  • Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月)

November

December

12/10

  • PMC (1st box) was delivered photo

12/14

  • Tiltsensors (3) were delivered

12/13

12/18

  • AC will be off due to the installation of the water pipes

12/19

  • ISS PDs install

12/27-28

  • ISS integration
    • 測定機器の確認
      • スペアナ(記憶媒体、データ変換機、操作方法を含む)場合によっては富山大から持ってくる
      • オシロスコープ
    • AOMケーブルの交換
    • PD入射レーザー強度を10mWにする
    • ループを閉じる
    • ロックでき、かつ時間が余っていたら測定してみる

January

  • 強度安定化の測定
  • open loop伝達関数の測定

1/9-12

  • IMC WFS? (野替)

1/22-26

  • PMC installation? (田原)
  • RAM MON 準備1 (22-24, 上原)

Feb

2/5-7

  • RAM MON 準備2 (上原)