Line 48: Line 48:
Line 50: Line 49:
 * Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月)  * --( Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月) )--
Line 53: Line 52:
 * PSL DCQPD install
 * Tiltsensor?
 * PSL DCQPD install - done [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3478|klog 3478]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3572|klog 3572]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3654|klog 3654]]
 * MCE DCQPD install - done [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3663|klog 3663]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3688|klog 3688]]
Line 57: Line 56:

=== 12/13 ===
 * ISS electronics install
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3830
  * PSL model and daqd needs to be restarted
  * Dsub cables should be tightened on servo

Schedule 2017 Oct - Dec

October

10/2-10/6

10/10- 10/14

IOO

IFO

1. ISS (PSL)

2. Beam alignment from IMMT2&PR2 to PR3

3. IMMT/PRM breadboard adjustment

4. IMMT1T DCQPD

  1. member
  2. ToyamaU, Kokeyama
  3. Kokeyama, Inoue?, Izumi?, Remote Michimura
  4. Kokeyama

10/16 - 10/20

  • Kokeyama will be away from 10/15 - 10/31, 中野君神岡にいてもらうことを了承

IOO

IFO

1. ISS (PSL)

2. PR3 alignment for EXA

3. 10/18 真空シャッターテスト続き(宗宮)

10/23 -10/27

  • Kokeyama will be away

IOO

IFO

1. 10/23 消音ダクト工事 (PSL)

2. EYAに到達するまでのBSアラインメント

  1. 対応川村先生、レーザーつけたままゴーグルで作業してもらう
  2. Izumi, Inoue, Remote Michimura

Later in Oct?

  • Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月)

November

December

12/13

KAGRA/Subgroups/IOO/scheduleLastHalf (last edited 2018-02-07 09:29:53 by KeikoKokeyama)