Line 75: Line 75:
=== 1/22-24 ===
 * RAM MON 準備1 (上原)
Line 78: Line 76:
=== 1/22-26 ===
 * PMC installation? (Tahara)
 * RAM MON 準備1 (22-24, 上原)

Schedule 2017 Oct - Dec

October

10/2-10/6

10/10- 10/14

IOO

IFO

1. ISS (PSL)

2. Beam alignment from IMMT2&PR2 to PR3

3. IMMT/PRM breadboard adjustment

4. IMMT1T DCQPD

  1. member
  2. ToyamaU, Kokeyama
  3. Kokeyama, Inoue?, Izumi?, Remote Michimura
  4. Kokeyama

10/16 - 10/20

  • Kokeyama will be away from 10/15 - 10/31, 中野君神岡にいてもらうことを了承

IOO

IFO

1. ISS (PSL)

2. PR3 alignment for EXA

3. 10/18 真空シャッターテスト続き(宗宮)

10/23 -10/27

  • Kokeyama will be away

IOO

IFO

1. 10/23 消音ダクト工事 (PSL)

2. EYAに到達するまでのBSアラインメント

  1. 対応川村先生、レーザーつけたままゴーグルで作業してもらう
  2. Izumi, Inoue, Remote Michimura

Later in Oct?

  • Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月)

November

December

12/10

  • PMC (1st box) was delivered photo

12/14

  • Tiltsensors (3) were delivered

12/13

12/18

  • AC will be off due to the installation of the water pipes

12/19

  • ISS PDs install

January

1/22-26

  • PMC installation? (Tahara)
  • RAM MON 準備1 (22-24, 上原)

Feb

2/5-7

  • RAM MON 準備2 (上原)