Line 7: Line 7:
 * IMMT1,2 敷板入れ、固定 - Koach filter 必要
 * IMM-PRM ダクト締結
 * ISS

 * ISS (Toyama U, Kokeyama, Nakano)

=== 10/10- 10/14 ===
|| IOO || IFO ||
|| 1. ISS (PSL) || 2. Beam alignment from IMMT2&PR2 to PR3 ||
|| 3. IMMT/PRM breadboard adjustment || ||

 1. member
 1. ToyamaU, Kokeyama
 1. Kokeyama, Inoue?, Izumi?, Remote Michimura

=== 10/16 - 10/20 ===

 * Kokeyama will be away from 10/15 - 10/31, 中野君神岡にいてもらうことを了承

|| IOO || IFO ||
|| 1. ISS (PSL) || 2. PR3 alignment for EXA||

 1. member
 1. Izumi, Inoue, Remote Michimura



=== 10/23 -10/27 ===
 * Kokeyama will be away
|| IOO || IFO ||
|| || EYAに到達するまでのBSアラインメント ||

Schedule 2017 Oct - Dec

October

10/2-10/6

  • ISS (Toyama U, Kokeyama, Nakano)

10/10- 10/14

IOO

IFO

1. ISS (PSL)

2. Beam alignment from IMMT2&PR2 to PR3

3. IMMT/PRM breadboard adjustment

  1. member
  2. ToyamaU, Kokeyama
  3. Kokeyama, Inoue?, Izumi?, Remote Michimura

10/16 - 10/20

  • Kokeyama will be away from 10/15 - 10/31, 中野君神岡にいてもらうことを了承

IOO

IFO

1. ISS (PSL)

2. PR3 alignment for EXA

  1. member
  2. Izumi, Inoue, Remote Michimura

10/23 -10/27

  • Kokeyama will be away

IOO

IFO

EYAに到達するまでのBSアラインメント

Later in Oct?

  • Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月)

November

December

  • AC installation in the PSL room