Size: 1209
Comment:
|
Size: 1238
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
* IMC TRANS DCQPD | * IMC TRANS DCQPD (assemble also IMMT1T DCQPD) |
Schedule 2017 Oct - Dec
Contents
October
10/2-10/6
- ISS (Toyama U, Kokeyama, Nakano)
- IMC TRANS DCQPD (assemble also IMMT1T DCQPD)
10/10- 10/14
IOO |
IFO |
1. ISS (PSL) |
2. Beam alignment from IMMT2&PR2 to PR3 |
3. IMMT/PRM breadboard adjustment |
|
4. IMMT1T DCQPD |
|
- member
- ToyamaU, Kokeyama
- Kokeyama, Inoue?, Izumi?, Remote Michimura
- Kokeyama
10/16 - 10/20
- Kokeyama will be away from 10/15 - 10/31, 中野君神岡にいてもらうことを了承
IOO |
IFO |
1. ISS (PSL) |
2. PR3 alignment for EXA |
- member
- Izumi, Inoue, Remote Michimura
10/23 -10/27
- Kokeyama will be away
IOO |
IFO |
1. 10/23 消音ダクト工事 (PSL) |
2. EYAに到達するまでのBSアラインメント |
- 対応川村先生、レーザーつけたままゴーグルで作業してもらう
- Izumi, Inoue, Remote Michimura
Later in Oct?
- Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月)
November
- PSL DCQPD install
- Tiltsensor?
December
- AC installation in the PSL room