= Schedule 2017 Oct - Dec = <> == October == === 10/2-10/6 === * --(ISS (Toyama U, Kokeyama, Nakano) )-- * --(QPD 組み立て IMC TRANS DCQPD (assemble also IMMT1T DCQPD) )-- => ペデスタル購入/スペーサ製作 * IMMT1, IMMT2 ミラーをリリースしてアライメント * IMMT1 Done http://klog.icrr.u-tokyo.ac.jp/osl/?r=3448 * IMMT2 * --( IMMT1,2 ピコモーター接続、動作テスト )-- Done http://klog.icrr.u-tokyo.ac.jp/osl/?r=3449 * IMMT2 TRANS、Oplev 引き回し * --(STM1, STM2, POM ピコモーター配線がきれていないか確認する)-- => きれてないっぽいが・・ * IMC/refcav normalization button http://klog.icrr.u-tokyo.ac.jp/osl/?r=3454 === 10/10- 10/14 === || IOO || IFO || || 1. ISS (PSL) || 2. Beam alignment from IMMT2&PR2 to PR3 || || 3. IMMT/PRM breadboard adjustment || || || 4. IMMT1T DCQPD || || 1. member 1. ToyamaU, Kokeyama 1. Kokeyama, Inoue?, Izumi?, Remote Michimura 1. Kokeyama === 10/16 - 10/20 === * Kokeyama will be away from 10/15 - 10/31, 中野君神岡にいてもらうことを了承 || IOO || IFO || || 1. ISS (PSL) || 2. PR3 alignment for EXA|| || 3. 10/18 真空シャッターテスト続き(宗宮) || || === 10/23 -10/27 === * Kokeyama will be away || IOO || IFO || || 1. 10/23 消音ダクト工事 (PSL) || 2. EYAに到達するまでのBSアラインメント || 1. 対応川村先生、レーザーつけたままゴーグルで作業してもらう 1. Izumi, Inoue, Remote Michimura === Later in Oct? === * --( Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月) )-- == November == * PSL DCQPD install - done [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3478|klog 3478]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3572|klog 3572]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3654|klog 3654]] * MCE DCQPD install - done [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3663|klog 3663]],[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3688|klog 3688]] == December == === 12/10 === * PMC (1st box) was delivered [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3807|photo]] === 12/14 === * Tiltsensors (3) were delivered === 12/13 === * ISS electronics install * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3830 * PSL model and daqd needs to be restarted * Dsub cables should be tightened on servo === 12/18 === * AC will be off due to the installation of the water pipes === 12/27 === * ISS AOM was properly cabled * Preparation for the PSL power change * ISS monitor channels were connected to the whitening filter before AA * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3915 === 12/28 === * ISS was locked in the isolated state * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3922 == January == === 1/16-19 === * IMC WFS (野替) * http://klog.icrr.u-tokyo.ac.jp/osl/?r=2987 * Tiltsensor (June Gyu, Kyuman) * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4009 * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4048 * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4051 * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4053 === 1/22-26 === * PMC assembling (田原) * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4114 * RAM MON 準備1 (22-24, 上原) * IMC WFS (野替) * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4033 == Feb == === 2/5-7 === * RAM MON 準備2 (上原) * ISS ノイズハンティング (酒本) * ISS 自動化準備 (北澤) * PMCケーブリング準備