Line 5: Line 5:
|| 4月 || Main path || || || || 設計 || || ||
|| 5月 ||FSS install, PMC製作 || || || 治具設計 || 製作 || || ||
|| 6月 || || AOM install || || 治具製作、鏡取り出し、接着 ||製作 || || Pickoff ||
|| 7月 ||PMC install || || || 鏡install
ation, integration || 製作 || || ||
|| 8月 || || || Lock || Beam profile || 製作 || || ||
|| 4月 || Main path || || || || Design || || ||
|| 5月 ||FSS install, PMC manufacture || || || Jig design || Manufacture || || ||
|| 6月 ||            || ||Initial Alignement|| Jig manufacture, glue ||Manufacture || || Pickoff ||
|| 7月 ||PMC install
|| AOM install (after PMC) || || Mirr installation, integration || Manufacture || || ||
|| 8月 || || || Lock || Beam profile || Manufacture || || ||
Line 17: Line 17:

== Note ==
 * 9月上旬 main beam がIFIから出てくる
 * BS-PR2のダクトを締結
 * 各種メインパスアライメント
 * BS-Yend Main beam 9/25- 1 week
 * その後、PR2-PR310/16の週から1ヶ月mode matching (cavityもないのでしないかもしれない)
 * ↑この期間を使って、Greenをエンドに飛ばせないか検討する。

Schedule Overview

Fiscal 2017

PSL

ISS

IMC

IMMT

Tilt

OMC

Green

4月

Main path

Design

5月

FSS install, PMC manufacture

Jig design

Manufacture

6月

Initial Alignement

Jig manufacture, glue

Manufacture

Pickoff

7月

PMC install

AOM install (after PMC)

Mirr installation, integration

Manufacture

8月

Lock

Beam profile

Manufacture

9月

ISS

WFS

10月

Installation

Installation

11月

12月

1月

2月

3月